WELL · 42-401-35312 · DISTRICT 6

Wilder SWD #1

WaterY

Rusk County · Overton E. (Woodbine) field · Injection  · Vertical

Wilder Swd #1 (API 42-401-35312) is a well in Rusk County operated by Lebus Energy, completed March 1, 2021 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued August 7, 2014, permitted to 5,500 ft.

It was permitted by Lkd Corp. and has since transferred to Lebus Energy on the wellbore schedule.

Completion filings report 12 formation tops, including Nacatoch, Woodbine, Buda, Georgetown.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 1.4M barrels injected in the 12 months reported through October 2025.

Operator of record

Lebus Energy

Permitted by LKD Corp.; the EWA schedule now lists a different operator.

Kilgore, TX · P-5 Y, filed Jun 4, 2026 · 1 permits on file · (903) 987-1244

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLebus Energy
Production reportsnone
Latest permitLKD Corp.Aug 7, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
1
permits on file
Aug 7, 2014
last permit issued
Mar 1, 2021
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 1, 2021
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilder SWD O-6-15364Overton, E. (Woodbine)Lebus Energy100Sep 2014 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
793014-99DrillLKD Corp.Jul 30, 2014Aug 7, 2014Aug 19, 20145,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-15364————

Formation tops

As filed on W-2/G-1. Subsea from 387 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch2,910-2,523
Woodbine3,460-3,073
WoodbineWOODBINE - EAST TEXAS FIELD (DIS3,460-3,073
Buda3,525-3,138
Georgetown3,790-3,403
FT Worth4,120-3,733
FT Worth Lime4,125-3,738
Duck Creek Lime4,395-4,008
Duck Creek Lime4,400-4,013
Paluxy4,510-4,123
Rodessa6,020-5,633
PettitPETTET6,800-6,413
Travis Peak7,190-6,803
Cotton Valley8,930-8,543

Perforations

Perforated and open-hole intervals.

FromToType
4,1274,137Perforated
4,1274,137Open hole
4,3984,410Perforated
4,3984,410Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,16512.25485 S
5.54,6237.8751,465 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 6, 2021Apr 5, 2021—
00Mar 8, 2021Mar 1, 2021—
00Feb 17, 2015Oct 28, 2014—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.4M
bbl, last 12 reported months
7.14M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000107818W-14 DisposalActive5,0001,8003,600–4,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,402,767 · prior 12 1,573,971(-11%)

0100K200K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40135312, documented in the API reference.