WELL · 42-401-35514 · DISTRICT 6
Pat Gratton Gas Unit B #2H
Rusk County · Horizontal
Pat Gratton Gas Unit B #2H (API 42-401-35514) is a permitted horizontal well in Rusk County filed by Buckhorn Operating LLC; no completion report is on file yet.
The RRC has issued one drilling permit (amended twice), issued July 23, 2026, permitted to 10,500 ft.
Operator of record
MT Enterprise, TX · P-5 Y, filed Apr 4, 2026 · 14 permits on file · (903) 918-8029
SOURCE · LATEST PERMIT (NO EWA RECORD)
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Buckhorn Operating LLCJul 23, 2026 |
- 10,500
- total depth, ft
- 3
- permits on file
- Jul 23, 2026
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 917276-97 | Drill | Buckhorn Operating LLC | Sep 1, 2026 | Jul 23, 2026 | Aug 2, 2026 | 10,500 |
| 917276-98 | Drill | Buckhorn Operating LLC | Aug 13, 2026 | Jul 23, 2026 | Aug 2, 2026 | 10,500 |
| 917276-99 | Drill | Buckhorn Operating LLC | Jul 17, 2026 | Jul 23, 2026 | — | 10,500 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40135514, documented in the API reference.