WELL · 42-401-86309 · DISTRICT 6

L.D. Crim #45W

Plugged

Rusk County · East Texas field  · Vertical

L.D. Crim #45W (API 42-401-86309) is a plugged well in Rusk County, plugged January 24, 2013, last operated by Zone Energy LLC.

The RRC has issued one drilling permit, issued July 11, 2012, permitted to 4,000 ft.

It was permitted by Zone Energy, LLC and has since transferred to Zone Energy LLC on the wellbore schedule.

Operator of record

Zone Energy LLC

Permitted by Zone Energy, LLC; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitZone Energy, LLCJul 11, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Jul 11, 2012
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 24, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
743871-99ReenterZone Energy, LLCJun 29, 2012Jul 11, 2012—4,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105694H-1 InjectionCanceled Dec 5, 20124,0001,7503,550–3,800

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40186309, documented in the API reference.