WELL · 42-403-30368 · DISTRICT 6

Odom R. E. Etal Unit 1 #1 H

Y

Sabine County · Brookeland (Austin Chalk 8800) field · Producing  · Horizontal

Odom R. E. Etal Unit 1 #1 H (API 42-403-30368) is a horizontal well in Sabine County operated by Lodel Energy Resources Corporati, completed February 15, 1994 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 1, 1993, permitted to 15,000 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Lodel Energy Resources Corporati on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Its lease has reported 76.6K barrels of oil and 236K mcf of gas since February 1994, last reporting in July 2026.

Operator of record

Lodel Energy Resources Corporati

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jul 4, 2026 · 2 permits on file · (737) 341-5610

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLodel Energy Resources Corporati
Production reportsReo Operating LLCthrough Apr 2025
Latest permitTexaco E & P Inc.Dec 1, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
1
permits on file
Dec 1, 1993
last permit issued
Feb 15, 1994
completed
76.6K
cumulative oil, bbl
236K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 15, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Odom, R. E. Etal Unit 1 O-6-13317Brookeland (Austin Chalk, 8800)Lodel Energy Resources Corporati176.6K236KFeb 1994 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 129(-100%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Mar 1994 → Jan 1998
  2. 2Union Pacific Resources CompanyFeb 1998 → Jul 1999
  3. 3Eclipse Oil & Gas, Inc.Oct 1999 → Oct 2001
  4. 4Mineral Technologies, Inc.Jan 2002 → Oct 2002
  5. 5TCF Energy, Inc.Nov 2002 → Aug 2003
  6. 6Noramco Production, LLCAug 2015 → Jan 2023
  7. 7Reo Operating LLCFeb 2023 → Apr 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
418797-99DrillTexaco E & P Inc.Nov 30, 1993Dec 1, 1993Dec 10, 199315,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-13317————

Formation tops

As filed on W-2/G-1. Subsea from 219 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkAUSTIN CHALK 88008,292-8,073

Perforations

Perforated and open-hole intervals.

FromToType
8,29212,492Perforated
8,99213,639Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,08514.751,500 S
7.6258,2929.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 31, 1994Apr 21, 1994Yes
00Aug 16, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40330368, documented in the API reference.