WELL · 42-403-30414 · DISTRICT 6
Jones C.S. Etal #1
Sabine County · Brookeland (Austin Chalk 8800) field · Horizontal
Jones C.S. Etal #1 (API 42-403-30414) is a plugged horizontal well in Sabine County, plugged May 2, 2001, last operated by Rme Petroleum Company.
The RRC has issued one drilling permit, issued July 3, 1995, permitted to 15,000 ft.
It was permitted by Texaco E & P Inc. and has since transferred to Rme Petroleum Company on the wellbore schedule.
Completion filings report one formation top, including Austin Chalk.
Its lease has reported 18.4K barrels of oil and 66.9K mcf of gas since October 1995, last reporting in June 2001.
Operator of record
Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Oct 5, 2018 · 512 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rme Petroleum Company |
| Production reports | Union Pacific Resources Companythrough Sep 2000 |
| Latest permit | Texaco E & P Inc.Jul 3, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,000
- total depth, ft
- 1
- permits on file
- Jul 3, 1995
- last permit issued
- Oct 21, 1995
- completed
- 18.4K
- cumulative oil, bbl
- 66.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Jun 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 21, 1995
- Shut in
- —
- Plugged
- May 2, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jones, C.S. Etal O-6-13508 | Brookeland (Austin Chalk, 8800) | Rme Petroleum Company | 1 | 18.4K | 66.9K | Oct 1995 – Jun 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Oct 1995 → Jan 1998
- 2Union Pacific Resources CompanyFeb 1998 → Sep 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 437452-99 | Drill | Texaco E & P Inc. | Jun 30, 1995 | Jul 3, 1995 | Aug 26, 1995 | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-13508 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 331 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 8,160 | -7,829 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,257 | 12,639 | Perforated |
| 8,257 | 12,663 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 60 | — | — |
| 10.75 | 2,562 | 14.75 | 1,285 S |
| 7.625 | 8,257 | 9.875 | 385 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 8, 1996 | Dec 13, 1995 | Yes |
| 00 | Mar 29, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-403-30414 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-403-30414 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40330414, documented in the API reference.