WELL · 42-405-30213 · DISTRICT 6
Common SWD #1
San Augustine County · Camp Worth (James Lime) field · Injection · Vertical
Common Swd #1 (API 42-405-30213) is a well in San Augustine County operated by Common Disposal LLC, completed October 29, 2008 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued February 12, 2008, permitted to 5,300 ft.
Completion filings report 5 formation tops, including Nacatosh, Saratoga, Base Pg, Woodbine.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 4.15M barrels injected in the 12 months reported through January 2026.
Operator of record
Chireno, TX · P-5 Y, filed Oct 4, 2025 · 10 permits on file · (936) 275-7057
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Common Disposal LLC |
| Production reports | none |
| Latest permit | Common Disposal, LLCFeb 12, 2008 |
- 5,300
- total depth, ft
- 1
- permits on file
- Feb 12, 2008
- last permit issued
- Oct 29, 2008
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 29, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Common SWD G-6-242507 | Camp Worth (James Lime) | Common Disposal, LLC | 1 | 0 | 0 | Oct 2008 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 654556-99 | Drill | Common Disposal, LLC | Feb 4, 2008 | Feb 12, 2008 | Sep 27, 2008 | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-242507 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 401 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Nacatosh | 3,052 | -2,651 |
| Saratoga | 3,080 | -2,679 |
| Base PG | 3,356 | -2,955 |
| Woodbine | 4,847 | -4,446 |
| Bac | 4,905 | -4,504 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,962 | 4,982 | Perforated |
| 5,018 | 5,040 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,602 | 12.25 | 930 S |
| 7 | 5,307 | 8.75 | 757 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 8, 2009 | Nov 17, 2008 | — |
| 00 | Dec 2, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-405-30213 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-405-30213 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 4.15M
- bbl, last 12 reported months
- 61.7M
- bbl, all reported
- Jan 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000098763 | W-14 Disposal | Active | 25,000 | 2,300 | 4,600–5,100 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 4,146,230 · prior 12 4,990,406(-17%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40530213, documented in the API reference.