WELL · 42-405-30232 · DISTRICT 6
Timberstar-Waterman B #2H
San Augustine County · Angie (James Lime) field · Horizontal
Timberstar-Waterman B #2H (API 42-405-30232) is a plugged horizontal well in San Augustine County, plugged February 1, 2017, last operated by Lime Rock Resources Iii-A L.P..
The RRC has issued one drilling permit, issued July 28, 2008, permitted to 7,600 ft.
It was permitted by Southwestern Energy Prod. CO. and has since transferred to Lime Rock Resources Iii-A L.P. on the wellbore schedule.
Completion filings report 3 formation tops, including Rodessa, Bexar, James Lime.
Operator of record
Lime Rock Resources III-a L.P.
Permitted by Southwestern Energy Prod. Co.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Jan 8, 2021 · 1 permits on file · (713) 345-2199
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lime Rock Resources III-a L.P. |
| Production reports | Lime Rock Resources III-a, L.P.through Mar 2017 |
| Latest permit | Southwestern Energy Prod. Co.Jul 28, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,600
- total depth, ft
- 1
- permits on file
- Jul 28, 2008
- last permit issued
- Nov 8, 2008
- completed
- 0
- cumulative oil, bbl
- 1.64M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2008 THROUGH May 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 8, 2008
- Shut in
- —
- Plugged
- Feb 1, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Timberstar-Waterman "B" G-6-245088 | Angie (James Lime) | Lime Rock Resources III-a, L.P. | 1 | 0 | 1.64M | Nov 2008 – May 2017 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Southwestern Energy Prod. Co.Nov 2008 → Jul 2013
- 2Lime Rock Resources III-a, L.P.Mar 2017 → Mar 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 666159-99 | Drill | Southwestern Energy Prod. Co. | Jul 7, 2008 | Jul 28, 2008 | Aug 6, 2008 | 7,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-245088 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 372 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 6,695 | -6,323 |
| Bexar | 7,114 | -6,742 |
| James LimeJAMES | 7,334 | -6,962 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,037 | 12,928 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,821 | 12.25 | 1,020 S |
| 7 | 7,482 | 8.75 | 333 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 5, 2009 | Dec 5, 2008 | Yes |
| 00 | Feb 23, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-405-30232 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-405-30232 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40530232, documented in the API reference.