WELL · 42-405-30258 · DISTRICT 6
Boles Cecilia #2H
San Augustine County · Angie (James Lime) field · Horizontal
Boles Cecilia #2H (API 42-405-30258) is a plugged horizontal well in San Augustine County, plugged June 21, 2019, last operated by Lime Rock Resources Iii-A L.P..
The RRC has issued one drilling permit, issued March 23, 2009, permitted to 7,600 ft.
It was permitted by Southwestern Energy Prod. CO. and has since transferred to Lime Rock Resources Iii-A L.P. on the wellbore schedule.
Completion filings report 3 formation tops, including Rodessa, Bexar, James Lime.
Operator of record
Lime Rock Resources III-a L.P.
Permitted by Southwestern Energy Prod. Co.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Jan 8, 2021 · 1 permits on file · (713) 345-2199
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lime Rock Resources III-a L.P. |
| Production reports | Lime Rock Resources III-a, L.P.through Jan 2019 |
| Latest permit | Southwestern Energy Prod. Co.Mar 23, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,600
- total depth, ft
- 1
- permits on file
- Mar 23, 2009
- last permit issued
- Aug 13, 2009
- completed
- 0
- cumulative oil, bbl
- 1.26M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2009 THROUGH Feb 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 13, 2009
- Shut in
- —
- Plugged
- Jun 21, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Boles, Cecilia G-6-252048 | Angie (James Lime) | Lime Rock Resources III-a, L.P. | 1 | 0 | 1.26M | Aug 2009 – Feb 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Southwestern Energy Prod. Co.Aug 2009 → Feb 2015
- 2SWN Production Company, LLCMar 2015 → May 2015
- 3Lime Rock Resources III-a, L.P.Jun 2015 → Jan 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 678142-99 | Drill | Southwestern Energy Prod. Co. | Feb 3, 2009 | Mar 23, 2009 | May 23, 2009 | 7,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-252048 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 388 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 6,786 | -6,398 |
| Bexar | 7,283 | -6,895 |
| James LimeJAMES | 7,479 | -7,091 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,785 | 11,325 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,423 | 12.25 | 731 S |
| 7 | 7,568 | 8.75 | 676 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 22, 2009 | Sep 23, 2009 | Yes |
| 00 | Oct 27, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-405-30258 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-405-30258 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40530258, documented in the API reference.