WELL · 42-405-30394 · DISTRICT 6
Borders Q #1H
San Augustine County · Carthage (Haynesville Shale) field · Producing · Horizontal
Borders Q #1H (API 42-405-30394) is a horizontal well in San Augustine County operated by Xto Energy Inc., completed September 15, 2011 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued November 18, 2010, permitted to 13,500 ft.
Completion filings report 3 formation tops, including James Lime, Travis Peak, Haynesville.
No lease production has been reported under this well’s leases.
Operator of record
Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,153 permits on file · (832) 625-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Apr 2026 |
| Latest permit | Southwestern Energy Prod. Co.Nov 18, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,500
- total depth, ft
- 2
- permits on file
- Nov 18, 2010
- last permit issued
- Sep 15, 2011
- completed
- 0
- cumulative oil, bbl
- 3.34M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 15, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Borders Q G-6-261377 | Carthage (Haynesville Shale) | XTO Energy Inc. | 1 | 0 | 3.34M | Feb 2011 – Jul 2026 |
Gas, mcf lease total
Last 12 months 23,117 · prior 12 26,796(-14%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XTO Energy Inc.Sep 2011 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 705344-97 | Drill | XTO Energy Inc. | Oct 11, 2012 | Nov 18, 2010 | Dec 29, 2010 | 13,500 |
| 705344-99 | Drill | Southwestern Energy Prod. Co. | Nov 15, 2010 | Nov 18, 2010 | Dec 29, 2010 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-261377 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 376 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James Lime | 7,426 | -7,050 |
| Travis Peak | 8,735 | -8,359 |
| Haynesville | 13,208 | -12,832 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,350 | 18,460 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,393 | 14.75 | 1,123 S |
| 7.625 | 12,419 | 9.875 | 14,413 S |
| 5.5 | 18,638 | 6.75 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 10, 2013 | Feb 2, 2012 | — |
| 00 | Nov 28, 2011 | Mar 29, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-405-30394 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-405-30394 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40530394, documented in the API reference.