WELL · 42-409-02014 · DISTRICT 4
Rachal Randolph B. #1
San Patricio County · Taft East (6250) field · Vertical
Rachal Randolph B. #1 (API 42-409-02014) is a plugged well in San Patricio County, plugged September 28, 2004, last operated by North Shore Energy L.L.C..
The RRC has issued one drilling permit, issued February 23, 2001, permitted to 6,300 ft.
Operator of record
Austin, TX · P-5 Y, filed Aug 4, 2025 · 38 permits on file · (512) 797-0153
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | North Shore Energy L.L.C. |
| Production reports | North Shore Energy, L.L.C.through Jul 2004 |
| Latest permit | North Shore Energy, L.L.C.Feb 23, 2001 |
- 6,300
- total depth, ft
- 1
- permits on file
- Feb 23, 2001
- last permit issued
- Aug 3, 2001
- completed
- 0
- cumulative oil, bbl
- 117K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2001 THROUGH Sep 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 3, 2001
- Shut in
- —
- Plugged
- Sep 28, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rachal, Randolph B. G-4-186878 | Taft, East (6250) | North Shore Energy, L.L.C. | 1 | 0 | 117K | Aug 2001 – Sep 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1North Shore Energy, L.L.C.Jan 2002 → Jul 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 504698-99 | Reenter | North Shore Energy, L.L.C. | Jan 30, 2001 | Feb 23, 2001 | Jul 13, 2001 | 6,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-186878 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,260 | 6,266 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 206 | 12.25 | — |
| 2.875 | 6,299 | 5.5 | 100 S |
| 5.5 | 6,300 | 8.75 | 380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 4, 2002 | Jan 22, 2002 | Yes |
| 00 | Feb 13, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-02014 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-02014 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40902014, documented in the API reference.