WELL · 42-409-03869 · DISTRICT 4

Welder Ranch #6

Plugged

San Patricio County · Oneil (5600) field  · Vertical

Welder Ranch #6 (API 42-409-03869) is a plugged well in San Patricio County, plugged July 22, 2009, last operated by Pan American Petroleum Corp..

The RRC has issued one drilling permit, issued August 29, 2001, permitted to 8,019 ft.

It was permitted by Smith Production Inc. and has since transferred to Pan American Petroleum Corp. on the wellbore schedule.

Operator of record

Pan American Petroleum Corp.

Permitted by Smith Production Inc.; the EWA schedule now lists a different operator.

Chicago, IL · P-5 Y, filed Jul 15, 1987

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePan American Petroleum Corp.
Production reportsEdge Petroleum Oper. Co., Inc.through Nov 2007
Latest permitSmith Production Inc.Aug 29, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,019
total depth, ft
1
permits on file
Aug 29, 2001
last permit issued
Dec 1, 1953
completed
0
cumulative oil, bbl
579K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 1, 1953
Shut in
—
Plugged
Jul 22, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder Ranch G-4-184372Angelita New (Frio)Edge Petroleum Oper. Co., Inc.10579KAug 2001 – Jul 2009
Welder Ranch G-4-61967Oneil (3270)Smith Production Inc.100Jan 1993 – Aug 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Smith Production Inc.Aug 2001 → Nov 2006
  2. 2Edge Petroleum Oper. Co., Inc.Feb 2007 → Nov 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
513025-99RecompletionSmith Production Inc.Aug 27, 2001Aug 29, 2001Jul 16, 20018,019

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-61967————
—— G-4-184372————

Perforations

Perforated and open-hole intervals.

FromToType
4,5564,560Perforated
6,2986,302Perforated
6,2986,638Perforated
6,3586,360Perforated
6,5566,570Perforated
6,6346,638Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,21415490 S
10.752,114—316 S
77,2939.8751,320 S
77,293—1,320 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 30, 2006Sep 12, 2005—
00Oct 18, 2001Aug 27, 2001Yes
00Sep 24, 2001——
00Jan 12, 1984May 9, 1975—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40903869, documented in the API reference.