WELL · 42-409-30012 · DISTRICT 4

J. F. Welder Unit #B16

N

San Patricio County  · Vertical

J. F. Welder Unit #B16 (API 42-409-30012) is a disposal or injection well in San Patricio County operated by Texaco Inc. under an active UIC permit.

The RRC has issued 2 drilling permits between 1979 and 1985, permitted to 9,000 ft.

Its lease has reported 60.4K barrels of oil and 705K mcf of gas since January 1993, last reporting in July 2026. The lease carries 14 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Texaco Inc.

Midland, TX · P-5 Y, filed Aug 3, 1992 · 4,906 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reports84 Energy LLCthrough Aug 2025
Latest permitTexaco Inc.Mar 26, 1985
9,000
total depth, ft
2
permits on file
Mar 26, 1985
last permit issued
—
completed
60.4K
cumulative oil, bbl
705K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 14 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder, J. F., Unit O-4-1996Odem84 Energy LLC1460.4K705KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 142 · prior 12 747(-81%)

050100150202420252026

Gas, mcf lease total

Last 12 months 157 · prior 12 2,234(-93%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Smith Production Inc.Sep 1995 → Apr 1999
  2. 2Energen Resources CorporationMay 1999 → Aug 2003
  3. 3Aroc (Texas) Inc.Sep 2003 → Feb 2005
  4. 4Southern Bay Operating, L.L.C.Mar 2005 → Jun 2013
  5. 5HK Energy Operating, LLCJul 2013 → Oct 2013
  6. 6Wagner Oil CompanyNov 2013 → Jul 2020
  7. 7GTG Operating, LLCAug 2020 → Dec 2024
  8. 884 Energy LLCFeb 2025 → Aug 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
270556-99RecompletionTexaco Inc.Mar 25, 1985Mar 26, 1985—9,000
48778-99RecompletionTexaco Inc.May 18, 1979May 18, 1979—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-1996————

Perforations

Perforated and open-hole intervals.

FromToType
2,7462,756Perforated
2,7702,790Perforated
2,8402,870Perforated
2,8832,895Perforated
6,6406,650Perforated
—6,658Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,52415800 S
13.3751,52417.5800 S
9.6257,33612.25850 S
78,3378.5195 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 8, 2010Feb 22, 2010—
00Oct 13, 1992Aug 28, 1992—
00May 5, 1992Apr 1, 1992—
00Apr 23, 1985Feb 25, 1985—
00Apr 10, 1985——
00Jan 12, 1984Jul 15, 1969—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
7.66M
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000047448W-14 DisposalActive6,0001,0002,230–4,520

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40930012, documented in the API reference.