WELL · 42-409-31167 · DISTRICT 4

White Point Development Company #1

Plugged

San Patricio County · White Point (2450) field  · Vertical

White Point Development Company #1 (API 42-409-31167) is a plugged well in San Patricio County, plugged February 16, 2015, last operated by Tyludadeda LLC.

The RRC has issued one drilling permit, issued November 8, 1977, permitted to 6,800 ft.

It was permitted by Huisache Operating CO. and has since transferred to Tyludadeda LLC on the wellbore schedule.

Operator of record

Tyludadeda LLC

Permitted by Huisache Operating Co.; the EWA schedule now lists a different operator.

Flagstaff, AZ · P-5 Y, filed May 4, 2026

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTyludadeda LLC
Production reportsScore Energy Companythrough Dec 1994
Latest permitHuisache Operating Co.Nov 8, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,800
total depth, ft
1
permits on file
Nov 8, 1977
last permit issued
Aug 31, 1977
completed
0
cumulative oil, bbl
1.45K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 31, 1977
Shut in
—
Plugged
Feb 16, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
White Point Development Company G-4-74019White Point (2450)Tyludadeda, LLC101.45KJan 1993 – Feb 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Score Energy CompanySep 1994 → Dec 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
3687-99DrillHuisache Operating Co.Nov 8, 1977Nov 8, 1977Jul 25, 19776,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-74019————

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62559612.25415 S
2.8754,1097.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Oct 31, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40931167, documented in the API reference.