WELL · 42-409-31261 · DISTRICT 4

Coggin Daniel I. Jr. et AL #2A

Plugged

San Patricio County · Midway (6200) field  · Vertical

Coggin Daniel I. JR. ET AL #2A (API 42-409-31261) is a plugged well in San Patricio County, plugged November 4, 2013, last operated by Geronimo Oil CO..

The RRC has issued 4 drilling permits between 1978 and 1993, permitted to 6,800 ft.

Completion filings report 4 formation tops, including Oakville, Catahoula, Anahuac, Marg-Frio.

Its 2 leases have reported 32.9K barrels of oil and 2.59K mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

Geronimo Oil Co.

Corpus Chrsti, TX · P-5 Y, filed Feb 6, 1998 · 93 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGeronimo Oil Co.
Production reportsChesnut Oil and Gas, Inc.through Jul 2008
Latest permitGeronimo Oil Co.Aug 2, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,800
total depth, ft
4
permits on file
Aug 2, 1993
last permit issued
Jan 4, 1979
completed
32.9K
cumulative oil, bbl
2.59K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 4, 1979
Shut in
—
Plugged
Nov 4, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Coggin, Daniel I.,jr., et AL O-4-9937Midway (Main Midway Sand)Chesnut Oil and Gas, Inc.411.2K1.01KJan 1993 – Jul 2026
Coggin, Daniel I. Jr. Etal O-4-11145Midway (5110)Chesnut Oil and Gas, Inc.221.7K1.58KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Geronimo Oil Co.Jan 1993 → Mar 1995
  2. 2Carrizo Oil & Gas, Inc.Apr 1995 → Jan 1999
  3. 3Chesnut Oil and Gas, Inc.Mar 2001 → Jul 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
414528-99RecompletionGeronimo Oil Co.Aug 2, 1993Aug 2, 1993Aug 2, 19936,710
288215-99RecompletionGeronimo Oil Co.Oct 21, 1985Oct 22, 1985—6,710
152093-99RecompletionGeronimo Oil Co.Feb 26, 1982Feb 26, 1982—6,710
30675-99DrillGeronimo Oil Co.Aug 14, 1978Aug 14, 1978Aug 16, 19786,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-9937————
—— O-4-11145————

Formation tops

As filed on W-2/G-1. Subsea from 53 ft elevation.Download CSV →

FormationMD ftSubsea
Oakville3,180-3,127
Catahoula4,080-4,027
Anahuac4,640-4,587
Marg-Frio5,030-4,977

Perforations

Perforated and open-hole intervals.

FromToType
5,1005,104Perforated
5,1085,111Perforated
5,3225,326Perforated
5,6885,692Perforated
6,2216,223Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62582012.25410 S
2.3755,575——
2.3756,068——
4.56,4537.8751,255 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 29, 1993Aug 6, 1993Yes
00Aug 12, 1993Oct 29, 1985Yes
00Nov 27, 1985Oct 29, 1985Yes
00Nov 23, 1985——
00Jan 12, 1984Mar 10, 1982—
00Jan 12, 1984Jan 9, 1979—
00Jan 12, 1984Sep 28, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40931261, documented in the API reference.