WELL · 42-409-31468 · DISTRICT 4
Gerdes R. GU A #2
San Patricio County · Ewing (1500) field · Vertical
Gerdes R. GU A #2 (API 42-409-31468) is a plugged well in San Patricio County, plugged April 4, 2011, last operated by NU-San Energy.
The RRC has issued 2 drilling permits between 1980 and 1983, permitted to 2,000 ft.
It was permitted by NU-San Energy, Inc. and has since transferred to NU-San Energy on the wellbore schedule.
Operator of record
Permitted by NU-San Energy, Inc.; the EWA schedule now lists a different operator.
Guthrie, OK · P-5 Y, filed Nov 5, 2010 · 9 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | NU-San Energy |
| Production reports | none |
| Latest permit | NU-San Energy, Inc.Dec 29, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 2
- permits on file
- Dec 29, 1983
- last permit issued
- Apr 3, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 3, 1985
- Shut in
- —
- Plugged
- Apr 4, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gerdes, R. GU "A" G-4-110795 | Ewing (1500) | NU-San Energy | 1 | 0 | 0 | Jan 1993 – Apr 2011 |
| — G-4-92002 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 225021-99 | Other | NU-San Energy, Inc. | Dec 29, 1983 | Dec 29, 1983 | — | 1,650 |
| 97488-99 | Drill | Curry, Landon | Oct 30, 1980 | Oct 30, 1980 | — | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-92002 | — | — | — | — |
| — | — G-4-110795 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,501 | 1,505 | Perforated |
| 1,501 | 1,510 | Perforated |
| 1,504 | 1,576 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 257 | 12.25 | 100 S |
| 2.375 | 1,411 | — | — |
| 4.5 | 1,706 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 25, 1985 | Jun 3, 1985 | — |
| 00 | Oct 25, 1984 | Feb 15, 1984 | — |
| 00 | Oct 15, 1984 | — | — |
| 00 | Jan 12, 1984 | Feb 12, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-31468 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-31468 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.47K
- bbl, all reported
- Nov 2001
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000056939 | H-1 Injection | Plugged May 31, 2011 | 0 | 100 | 1,501–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40931468, documented in the API reference.