WELL · 42-409-31669 · DISTRICT 4
Coggin Daniel I Jr. et AL #6A
San Patricio County · Midway-Holst (5600 Sand) field · Vertical
Coggin Daniel I JR. ET AL #6A (API 42-409-31669) is a plugged well in San Patricio County, plugged August 12, 2013, last operated by Geronimo Oil CO..
The RRC has issued 3 drilling permits between 1982 and 1993, permitted to 5,812 ft.
Completion filings report 4 formation tops, including Oakville, Catahoula, Anahuac, Marg-Frio.
Operator of record
Corpus Chrsti, TX · P-5 Y, filed Feb 6, 1998 · 93 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Geronimo Oil Co. |
| Production reports | Chesnut Oil and Gas, Inc.through Mar 2005 |
| Latest permit | Geronimo Oil Co.Sep 2, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,812
- total depth, ft
- 3
- permits on file
- Sep 2, 1993
- last permit issued
- Sep 27, 1982
- completed
- 0
- cumulative oil, bbl
- 8.24K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 27, 1982
- Shut in
- —
- Plugged
- Aug 12, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coggin, Daniel I. Jr., et AL G-4-146505 | Midway (2900) | Chesnut Oil and Gas, Inc. | 1 | 0 | 4.95K | Sep 1993 – Oct 2013 |
| Coggin, Daniel I. Jr. et AL G-4-113720 | Midway (3600) | Geronimo Oil Co. | 1 | 0 | 3.29K | Jan 1993 – Sep 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Geronimo Oil Co.Jan 1993 → Dec 1994
- 2Chesnut Oil and Gas, Inc.Jun 2003 → Mar 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 415621-99 | Recompletion | Geronimo Oil Co. | Sep 2, 1993 | Sep 2, 1993 | Sep 5, 1993 | 5,800 |
| 257247-99 | Recompletion | Geronimo Oil Co. | Sep 28, 1984 | Nov 8, 1984 | — | 5,812 |
| 170451-99 | Drill | Geronimo Oil Co. | Aug 30, 1982 | Aug 30, 1982 | — | 5,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-113720 | — | — | — | — |
| — | — G-4-146505 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 41 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,980 | 2,984 | Perforated |
| 3,644 | 3,647 | Perforated |
| 5,668 | 5,672 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 817 | 12.25 | 420 S |
| 2.375 | 5,500 | — | — |
| 4.5 | 5,807 | 7.875 | 720 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 12, 1993 | Sep 20, 1993 | Yes |
| 00 | Sep 24, 1993 | — | — |
| 00 | Dec 18, 1984 | Nov 27, 1984 | — |
| 00 | Dec 4, 1984 | Nov 17, 1984 | — |
| 00 | Jan 12, 1984 | Oct 22, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-31669 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-31669 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40931669, documented in the API reference.