WELL · 42-409-31810 · DISTRICT 4

Coggin Daniel I. Jr et AL #9A

Plugged

San Patricio County · Midway (5050 Sand) field  · Vertical

Coggin Daniel I. JR ET AL #9A (API 42-409-31810) is a plugged well in San Patricio County, plugged October 17, 2013, last operated by Chesnut Oil And Gas Inc..

The RRC has issued 2 drilling permits between 1983 and 1993, permitted to 5,812 ft.

It was permitted by Geronimo Oil CO. and has since transferred to Chesnut Oil And Gas Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Oakville, Shale, Catahoula, Anahuac.

Its 2 leases have reported 18.2K barrels of oil and 1.07K mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Chesnut Oil and Gas Inc.

Permitted by Geronimo Oil Co.; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed Apr 8, 2016 · 3 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChesnut Oil and Gas Inc.
Production reportsChesnut Oil and Gas, Inc.through Dec 2004
Latest permitGeronimo Oil Co.Aug 2, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,812
total depth, ft
2
permits on file
Aug 2, 1993
last permit issued
Aug 5, 1993
completed
18.2K
cumulative oil, bbl
1.07K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 5, 1993
Shut in
—
Plugged
Oct 17, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Coggin, Daniel I.,jr., et AL O-4-9937Midway (Main Midway Sand)Chesnut Oil and Gas, Inc.411.2K1.01KJan 1993 – Jul 2026
Coggin, Daniel I. Jr et AL O-4-12232Midway (5050 Sand)Chesnut Oil and Gas, Inc.17.09K62Aug 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Geronimo Oil Co.Jan 1993 → Mar 1995
  2. 2Carrizo Oil & Gas, Inc.Apr 1995 → Jan 1999
  3. 3Chesnut Oil and Gas, Inc.Apr 2003 → Dec 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
414527-99DrillGeronimo Oil Co.Aug 2, 1993Aug 2, 1993Aug 4, 19935,812
209846-99DrillGeronimo Oil Co.Aug 24, 1983Sep 6, 1983Nov 12, 19835,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-9937————
—— O-4-12232————

Formation tops

As filed on W-2/G-1. Subsea from 54 ft elevation.Download CSV →

FormationMD ftSubsea
Oakville3,200-3,146
Shale3,730-3,676
Catahoula4,070-4,016
Anahuac4,640-4,586
Marg-Frio5,035-4,981
Sd. & Sh.——

Perforations

Perforated and open-hole intervals.

FromToType
5,0375,040Perforated
5,0375,044Perforated
5,3205,324Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62584512.25485 S
4.55,8127.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 29, 1993Aug 9, 1993Yes
00Aug 19, 1993Dec 9, 1983—
00Jan 26, 1984Dec 9, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40931810, documented in the API reference.