WELL · 42-409-31893 · DISTRICT 4

Welder M.S. #66H

N

San Patricio County · Portilla (8500 Sand) field  · Horizontal

Welder M.S. #66H (API 42-409-31893) is a horizontal well in San Patricio County operated by Mobil Producing TX. & N.M. Inc., completed April 16, 1984.

The RRC has issued 7 drilling permits (amended once) between 1984 and 1997, permitted to 9,100 ft.

It was permitted by Abraxas Petroleum Corporation and has since transferred to Mobil Producing TX. & N.M. Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including 8100 Sand, Portilla (8100 Sd.), 8500 Sand, Portilla (8500 Sd.).

Its 5 leases have reported 3.39M barrels of oil and 7.56M mcf of gas since January 1993, last reporting in July 2026. The leases carry 167 wells, so these are lease totals, not this well alone.

Operator of record

Mobil Producing TX. & N.M. Inc.

Permitted by Abraxas Petroleum Corporation; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed May 4, 2026 · 6,763 permits on file · (281) 773-7706

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMobil Producing TX. & N.M. Inc.
Production reportsAllegiant Resources, LLCthrough Apr 2026
Latest permitAbraxas Petroleum CorporationApr 15, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,100
total depth, ft
8
permits on file
Apr 15, 1997
last permit issued
Apr 16, 1984
completed
3.39M
cumulative oil, bbl
7.56M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 16, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 167 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder, Minnie S. O-4-12594Portilla (Frio)Allegiant Resources, LLC1102.66M5.72MSep 1996 – Jul 2026
Welder, Minnie S. O-4-2178Portilla (7400 Sand)Abraxas Petroleum Corporation43686K1.65MJan 1993 – Nov 1996
Welder, Minnie S. O-4-2180Portilla (8100 Sand)Abraxas Petroleum Corporation1347.7K180KJan 1993 – Nov 1996
Welder, Minnie S. O-4-11944Portilla (7700-a Sand)Abraxas Production Corporation12832.59KJan 1993 – May 1993
— O-4-11075——000—

Oil, barrels lease total

Last 12 months 11,265 · prior 12 23,209(-51%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 44,651 · prior 12 31,729(+41%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Mar 1993
  2. 2Abraxas Production CorporationApr 1993 → Jan 1996
  3. 3Abraxas Petroleum CorporationFeb 1996 → Aug 2016
  4. 4Frostwood Energy, LLCSep 2016 → Jan 2021
  5. 5Allegiant Resources, LLCFeb 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
461127-99RecompletionAbraxas Petroleum CorporationApr 15, 1997Apr 15, 1997Apr 15, 19978,600
407080-99RecompletionMobil Producing TX. & N.M. Inc.Dec 10, 1992Jan 5, 1993Mar 8, 19938,600
386229-98RecompletionMobil Producing TX. & N.M. Inc.May 20, 1991Apr 2, 1991Apr 24, 19918,600
386229-99RecompletionMobil Producing TX. & N.M. Inc.Mar 29, 1991Apr 2, 1991—8,600
373534-99RecompletionMobil Producing TX. & N.M. Inc.May 18, 1990May 22, 1990—8,600
301557-99RecompletionMobil Producing TX. & N.M. Inc.Apr 22, 1986Apr 28, 1986—8,600
237227-99DrillSuperior Oil Company, TheApr 30, 1984Apr 30, 1984—9,100
229464-99DrillSuperior Oil Company, TheFeb 6, 1984Feb 6, 1984—9,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-2178————
—— O-4-2180————
—— O-4-11075————
—— O-4-11944————
—— O-4-12594————
—— O-4-12594————

Formation tops

As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →

FormationMD ftSubsea
8100 Sand8,082-8,065
Portilla (8100 Sd.)8,082-8,065
8500 Sand8,532-8,515
Portilla (8500 Sd.)8,532-8,515

Perforations

Perforated and open-hole intervals.

FromToType
7,3447,352Perforated
7,3487,356Perforated
7,5457,745Perforated
7,6987,703Perforated
8,0848,103Perforated
8,0928,103Perforated
8,3798,384Perforated
8,3898,393Perforated
8,4048,412Perforated
8,4248,431Perforated
8,5328,542Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,23814.75596 sx
10.751,238——
7.6258,6009.8751,180 sx
7.6258,600——
78,600——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 27, 1998Jul 28, 1997Yes
00Feb 23, 1998Jun 3, 1993—
00Sep 5, 1996Jun 3, 1993—
00Sep 28, 1993Jun 3, 1993—
00Apr 28, 1993Mar 26, 1993Yes
00Apr 1, 1993May 29, 1991Yes
00Jul 18, 1991May 29, 1991Yes
00Jun 18, 1991Jun 25, 1990Yes
00Oct 1, 1990Jun 25, 1990Yes
00Aug 24, 1990——
00Feb 29, 1988Jan 12, 1988—
00Feb 3, 1988May 7, 1984—
00Aug 19, 1986Jul 29, 1986Yes
00Aug 6, 1986——
00Jun 5, 1984May 7, 1984—
00Jun 4, 1984May 7, 1984—
00May 25, 1984May 7, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000116144H-1 InjectionNot activated10,0001,9773,955–4,968

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40931893, documented in the API reference.