WELL · 42-409-31947 · DISTRICT 4
Kellogg Gas Unit #4
San Patricio County · White Point East Deep (Hatch) field · Vertical
Kellogg Gas Unit #4 (API 42-409-31947) is a well in San Patricio County operated by Marathon Oil Company, completed October 18, 1984.
The RRC has issued 4 drilling permits between 1984 and 1998, permitted to 12,000 ft.
Completion filings report 4 formation tops, including Miocene (undifferentiated), Anahuac, Frio, Catahoula.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 242K barrels injected in the 12 months reported through November 2025.
Operator of record
Houston, TX · P-5 Y, filed Apr 4, 2026 · 3,707 permits on file · (800) 332-9449
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Marathon Oil Company |
| Production reports | Marathon Oil Companythrough Mar 2002 |
| Latest permit | Marathon Oil CompanyMar 6, 1998 |
- 12,000
- total depth, ft
- 4
- permits on file
- Mar 6, 1998
- last permit issued
- Oct 18, 1984
- completed
- 0
- cumulative oil, bbl
- 321K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 18, 1984
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kellogg Gas Unit G-4-167071 | White Point, E. (Scooter Sand) | Orx Resources, L.L.C. | 1 | 0 | 184K | Feb 1998 – Jul 2026 |
| Kellogg Gas Unit G-4-148564 | White Point, East (Dubose) | Marathon Oil Company | 1 | 0 | 137K | May 1993 – Feb 1998 |
| Kellogg Gas Unit G-4-138579 | Wildcat | Marathon Oil Company | 1 | 0 | 0 | Jan 1993 – May 1993 |
| — G-4-115954 | — | — | 0 | 0 | 0 | — |
| — G-4-115955 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Marathon Oil CompanyMar 1994 → Mar 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 473810-99 | Recompletion | Marathon Oil Company | Feb 26, 1998 | Mar 6, 1998 | Feb 10, 1998 | 11,679 |
| 422439-99 | Recompletion | Marathon Oil Company | Mar 28, 1994 | Mar 28, 1994 | Mar 24, 1993 | 11,679 |
| 361168-99 | Recompletion | Marathon Oil Company | Jul 6, 1989 | Jul 11, 1989 | Jul 21, 1989 | 11,679 |
| 243171-99 | Drill | Marathon Oil Company | Jun 25, 1984 | Jun 25, 1984 | Jul 27, 1984 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-115954 | — | — | — | — |
| — | — G-4-115955 | — | — | — | — |
| — | — G-4-138579 | — | — | — | — |
| — | — G-4-148564 | — | — | — | — |
| — | — G-4-167071 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 54 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1 | 53 |
| Anahuac | 4,450 | -4,396 |
| Miocene (undifferentiated)MIOCENE / LAGARTO / OAKVILLE | 4,450 | -4,396 |
| Anahuac | 4,500 | -4,446 |
| Frio | 4,900 | -4,846 |
| Frio | 5,150 | -5,096 |
| CatahoulaCATAHOULA / ANAHUAC | 5,600 | -5,546 |
| Frio | 7,300 | -7,246 |
| FrioLOWER FRIO | 10,682 | -10,628 |
| CatahoulaCATAHOULA / FRIO | 13,000 | -12,946 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,360 | 7,760 | Perforated |
| 8,766 | 8,768 | Perforated |
| 8,806 | 8,810 | Perforated |
| 9,209 | 9,214 | Perforated |
| 9,219 | 9,222 | Perforated |
| 9,656 | 9,693 | Perforated |
| 10,362 | 10,368 | Perforated |
| 10,372 | 10,378 | Perforated |
| 10,384 | 10,392 | Perforated |
| 10,396 | 10,412 | Perforated |
| 10,472 | 10,476 | Perforated |
| 10,897 | 10,929 | Perforated |
| 10,933 | 10,943 | Perforated |
| 10,956 | 10,982 | Perforated |
| 10,986 | 10,995 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 755 | 26 | 1,965 S |
| 13.375 | 4,761 | 17.5 | 2,865 S |
| 5.5 | 7,930 | 6.75 | 1,271 S |
| 9.625 | 10,292 | 12.25 | 3,040 S |
| 9.625 | 10,292 | — | 3,040 S |
| 13.375 | — | — | 900 S |
| 13.375 | — | 17.5 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 29, 2016 | Sep 7, 2016 | — |
| 00 | Jun 22, 2016 | Jun 2, 2016 | — |
| 00 | Sep 8, 2000 | Jul 25, 2000 | — |
| 00 | Jun 30, 2000 | May 17, 2000 | — |
| 00 | Apr 9, 1998 | Mar 2, 1998 | Yes |
| 00 | Mar 17, 1998 | — | — |
| 00 | May 19, 1994 | Mar 24, 1994 | Yes |
| 00 | Mar 31, 1994 | — | — |
| 00 | Jul 29, 1991 | Jul 1, 1991 | Yes |
| 00 | Jul 10, 1991 | — | — |
| 00 | May 13, 1985 | Mar 28, 1985 | — |
| 00 | May 8, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-31947 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-31947 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 242K
- bbl, last 12 reported months
- 2.86M
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000113375 | H-1 Injection | Active | 8,000 | 3,550 | 7,100–8,650 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 242,154 · prior 12 350,951(-31%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40931947, documented in the API reference.