WELL · 42-409-32280 · DISTRICT 4

Haisley Waldo E. #1

Plugged

San Patricio County · Harvey ( Frio 9300) field  · Vertical

Haisley Waldo E. #1 (API 42-409-32280) is a plugged well in San Patricio County, plugged December 2, 2022, last operated by Sandel Operating Company.

The RRC has issued 2 drilling permits between 1988 and 1996, permitted to 10,000 ft.

It was permitted by Bargo Energy Company and has since transferred to Sandel Operating Company on the wellbore schedule.

Completion filings report 3 formation tops, including 20-C, Dubose, Anderson.

Operator of record

Sandel Operating Company

Permitted by Bargo Energy Company; the EWA schedule now lists a different operator.

Huntsville, TX · P-5 Y, filed Jul 4, 2026 · 11 permits on file · (936) 662-8585

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSandel Operating Company
Production reportsSandel Operating Companythrough Oct 2018
Latest permitBargo Energy CompanyApr 2, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
2
permits on file
Apr 2, 1996
last permit issued
Mar 27, 1996
completed
0
cumulative oil, bbl
1.18M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 27, 1996
Shut in
—
Plugged
Dec 2, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haisley, Waldo E. G-4-158096Harvey ( Frio 9300)Sandel Operating Company10979KMar 1996 – Dec 2022
Haisley, Waldo E. G-4-131593Candy B. (Anderson Sand 9500)Bargo Energy Company10200KJan 1993 – Aug 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Torch Operating CompanyJan 1993 → Jan 1996
  2. 2Bargo Energy CompanyFeb 1996 → May 2001
  3. 3Future Petroleum CorporationSep 1998 → Jul 1999
  4. 4Mission Resources CorporationJun 2001 → Oct 2002
  5. 5Matador Operating CompanyNov 2002 → Jul 2003
  6. 6Brown, Tom Inc.Aug 2003 → Dec 2004
  7. 7Encana Oil & Gas(usa) Inc.Jan 2005 → Feb 2008
  8. 8Sandel Operating CompanyMar 2008 → Oct 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446568-99RecompletionBargo Energy CompanyApr 2, 1996Apr 2, 1996Mar 26, 199610,000
353552-99DrillFelmont Oil Corp.Nov 22, 1988Nov 23, 1988—10,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-131593————
—— G-4-158096————

Formation tops

As filed on W-2/G-1. Subsea from 22 ft elevation.Download CSV →

FormationMD ftSubsea
20-C9,064-9,042
Dubose9,205-9,183
Anderson9,540-9,518

Perforations

Perforated and open-hole intervals.

FromToType
9,2689,296Perforated
9,5399,570Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,50412.25365 S
5.59,7838.75640 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 21, 1999Apr 12, 1996Yes
00May 29, 1996—Yes
00Aug 28, 1989Jul 3, 1989Yes
00Aug 23, 1989—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40932280, documented in the API reference.