WELL · 42-409-32497 · DISTRICT 4

Welder E.H. E #32

Y

San Patricio County · Rooke (7500) field · Shut IN  · Vertical

Welder E.H. E #32 (API 42-409-32497) is a well in San Patricio County operated by Mcgowan Working Partners Inc., completed April 18, 1996 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued March 22, 1996, permitted to 9,000 ft.

It was permitted by Marathon Oil Company and has since transferred to Mcgowan Working Partners Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Anahuac, Frio.

Its lease has reported 55 barrels of oil and 21.3K mcf of gas since April 1996, last reporting in July 2026.

Operator of record

McGowan Working Partners Inc.

Permitted by Marathon Oil Company; the EWA schedule now lists a different operator.

Jackson, MS · P-5 Y, filed Aug 4, 2025 · 60 permits on file · (800) 224-4572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcGowan Working Partners Inc.
Production reportsMarathon Oil Companythrough Jun 1996
Latest permitMarathon Oil CompanyMar 22, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
3
permits on file
Mar 22, 1996
last permit issued
Apr 18, 1996
completed
55
cumulative oil, bbl
21.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 18, 1996
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder, E.H. "E" O-4-12603Rooke (7500)McGowan Working Partners, Inc.15521.3KApr 1996 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyMay 1996 → May 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446171-97DrillMarathon Oil CompanySep 12, 1996Mar 22, 1996—9,000
446171-98DrillMarathon Oil CompanyAug 13, 1996Mar 22, 1996Mar 24, 19969,000
446171-99DrillMarathon Oil CompanyMar 22, 1996Mar 22, 1996—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-12603————

Formation tops

As filed on W-2/G-1. Subsea from 15 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE114
Anahuac4,450-4,435
Frio5,100-5,085

Perforations

Perforated and open-hole intervals.

FromToType
7,9577,965Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,56312.25500 S
5.58,2197.875435 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 14, 1996Aug 12, 1996Yes
00Sep 19, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 2001
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089971H-1 InjectionNot activated10,0001,0004,000–6,470

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012001

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40932497, documented in the API reference.