WELL · 42-409-32752 · DISTRICT 4
Jostes #1
San Patricio County · Mathis North (Vicksburg Lower) field · Vertical
Jostes #1 (API 42-409-32752) is a plugged well in San Patricio County, plugged October 17, 2022, last operated by Rodessa Operating Company.
The RRC has issued one drilling permit, issued December 2, 2003, permitted to 4,800 ft.
It was permitted by Arrowhead Energy Exp., LLC and has since transferred to Rodessa Operating Company on the wellbore schedule.
Completion filings report 2 formation tops, including Het 1, Lwr Vick Massive.
Operator of record
Permitted by Arrowhead Energy Exp., LLC; the EWA schedule now lists a different operator.
Corpus Chrsti, TX · P-5 Y, filed Jul 4, 2026 · 63 permits on file · (361) 815-6420
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rodessa Operating Company |
| Production reports | Rodessa Operating Companythrough May 2009 |
| Latest permit | Arrowhead Energy Exp., LLCDec 2, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,800
- total depth, ft
- 1
- permits on file
- Dec 2, 2003
- last permit issued
- Aug 11, 2005
- completed
- 0
- cumulative oil, bbl
- 108K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 11, 2005
- Shut in
- —
- Plugged
- Oct 17, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jostes G-4-201784 | Mathis, North (Vicksburg, Lower) | Rodessa Operating Company | 1 | 0 | 108K | Mar 2004 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Arrowhead Energy Exp., LLCJun 2004 → Nov 2006
- 2Rodessa Operating CompanyDec 2006 → May 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 539167-99 | Drill | Arrowhead Energy Exp., LLC | Dec 2, 2003 | Dec 2, 2003 | Dec 15, 2003 | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-201784 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 180 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Het 1 | 2,680 | -2,500 |
| LWR Vick Massive | 4,335 | -4,155 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,818 | 3,828 | Perforated |
| 3,900 | 3,906 | Perforated |
| 3,942 | 3,950 | Perforated |
| 3,948 | 3,951 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 820 | 12.25 | 130 S |
| 4.5 | 4,809 | 7.875 | 560 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 14, 2007 | Aug 28, 2006 | — |
| 00 | Nov 3, 2005 | Jun 27, 2005 | — |
| 00 | Aug 5, 2004 | May 24, 2004 | Yes |
| 00 | Jun 29, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-32752 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-32752 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40932752, documented in the API reference.