WELL · 42-409-32862 · DISTRICT 4
White Point Oil & Gas #1
San Patricio County · White Point (3200) field · Vertical
White Point Oil & Gas #1 (API 42-409-32862) is a plugged well in San Patricio County, plugged December 31, 2012, last operated by Mego Resources LLC.
The RRC has issued 3 drilling permits between 2007 and 2010, permitted to 3,400 ft.
Operator of record
Taft, TX · P-5 Y, filed Nov 4, 2025 · 67 permits on file · (361) 815-2158
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mego Resources LLC |
| Production reports | Mego Resources, LLCthrough Sep 2010 |
| Latest permit | Mego Resources, LLCJul 20, 2010 |
- 3,400
- total depth, ft
- 3
- permits on file
- Jul 20, 2010
- last permit issued
- Jun 30, 2007
- completed
- 0
- cumulative oil, bbl
- 22.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2007 THROUGH Dec 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 30, 2007
- Shut in
- —
- Plugged
- Dec 31, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| White Point Oil & Gas G-4-257192 | White Point (2200) | Mego Resources, LLC | 1 | 0 | 389 | Aug 2010 – Dec 2012 |
| White Point Oil & Gas G-4-242268 | White Point (2450) | Mego Resources, LLC | 1 | 0 | 5K | Aug 2008 – Aug 2010 |
| White Point Oil & Gas G-4-228124 | White Point (3200) | Mego Resources, LLC | 1 | 0 | 17K | Jun 2007 – Aug 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mego Resources, LLCJun 2007 → Sep 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 699163-99 | Recompletion | Mego Resources, LLC | Jul 16, 2010 | Jul 20, 2010 | Aug 2, 2010 | 3,284 |
| 661462-99 | Recompletion | Mego Resources, LLC | May 7, 2008 | Aug 11, 2008 | Aug 16, 2008 | 3,284 |
| 638164-99 | Drill | Mego Resources, LLC | May 1, 2007 | May 14, 2007 | May 22, 2007 | 3,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-228124 | — | — | — | — |
| — | — G-4-242268 | — | — | — | — |
| — | — G-4-257192 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,147 | 2,149 | Perforated |
| 2,382 | 2,385 | Perforated |
| 3,218 | 3,223 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 510 | 12.25 | — |
| 4.5 | 3,328 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 14, 2010 | Sep 2, 2010 | Yes |
| 00 | Sep 7, 2010 | — | — |
| 00 | Jan 13, 2009 | Sep 5, 2008 | Yes |
| 00 | Nov 20, 2008 | — | — |
| 00 | Jul 24, 2007 | Jul 11, 2007 | Yes |
| 00 | Jul 18, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-32862 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-32862 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40932862, documented in the API reference.