WELL · 42-413-00281 · DISTRICT 7
Page Brothers #1-40
Schleicher County · Page field · Vertical
Page Brothers #1-40 (API 42-413-00281) is a plugged well in Schleicher County, plugged February 28, 2024, last operated by Unitex Oil & Gas L.L.C..
The RRC has issued one drilling permit, issued August 23, 1978, permitted to 5,700 ft.
It was permitted by C & E Operator'S, Inc. and has since transferred to Unitex Oil & Gas L.L.C. on the wellbore schedule.
Completion filings report one formation top, including Strawn.
Operator of record
Permitted by C & E Operator's, Inc.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Feb 4, 2026 · 96 permits on file · (432) 770-8831
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Unitex Oil & Gas L.L.C. |
| Production reports | Unitex Oil & Gas, L.L.C.through Jun 2022 |
| Latest permit | C & E Operator's, Inc.Aug 23, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,700
- total depth, ft
- 1
- permits on file
- Aug 23, 1978
- last permit issued
- Nov 5, 1978
- completed
- 0
- cumulative oil, bbl
- 787K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 5, 1978
- Shut in
- —
- Plugged
- Feb 28, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Page Brothers G-9-80529 | Page (Strawn Lime) | Unitex Oil & Gas, L.L.C. | 1 | 0 | 787K | Jan 1993 – Feb 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Parallel Petroleum CorporationJan 1993 → Jan 2010
- 2Parallel Petroleum LLCFeb 2010 → Dec 2010
- 3Tradition Resources LLCJan 2011 → Jan 2014
- 4Tradition Resources Oper, LLCFeb 2014 → Jun 2017
- 5Unitex Oil & Gas, L.L.C.Jul 2017 → Jun 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 31194-99 | Other | C & E Operator's, Inc. | Aug 23, 1978 | Aug 23, 1978 | — | 5,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-80529 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,299 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| StrawnLOWER STRAWN | 5,667 | -3,368 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,217 | 5,263 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 454 | 12.25 | — |
| 9.625 | 454 | — | — |
| 2.875 | 5,540 | 4.5 | 50 S |
| 5.5 | 5,669 | 8.75 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 12, 2013 | Nov 11, 2013 | — |
| 00 | Jan 12, 1984 | Jan 15, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-413-00281 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-413-00281 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41300281, documented in the API reference.