WELL · 42-413-30647 · DISTRICT 7

Edmiston #1

N

Schleicher County · Page West (Wolfcamp) field  · Vertical

Edmiston #1 (API 42-413-30647) is a well in Schleicher County operated by Pennzoil Exploration & Prod. CO., completed March 11, 1978.

The RRC has issued one drilling permit, issued December 12, 1977, permitted to 7,500 ft.

It was permitted by Pennzoil Company and has since transferred to Pennzoil Exploration & Prod. CO. on the wellbore schedule.

Completion filings report 5 formation tops, including B/Cretaceous, Wolfcamp, B/Upper Wolfcamp Lime, B/L.W.C.Lm & T/Canyon.

Its 2 leases have reported 30.6K barrels of oil and 376K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Pennzoil Exploration & Prod. Co.

Permitted by Pennzoil Company; the EWA schedule now lists a different operator.

Carthage, TX · P-5 Y, filed Mar 22, 2001 · 1,023 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePennzoil Exploration & Prod. Co.
Production reportsOXY USA Inc.through Apr 2026
Latest permitPennzoil CompanyDec 12, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
1
permits on file
Dec 12, 1977
last permit issued
Mar 11, 1978
completed
30.6K
cumulative oil, bbl
376K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 11, 1978
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Edmiston O-9-10612Page, West (Wolfcamp)Hilcorp Energy Company230.6K376KJan 1993 – Jul 2026
— G-9-75555——000—

Gas, mcf lease total

Last 12 months 3,954 · prior 12 5,986(-34%)

05001K202420252026

Oil, barrels lease total

Last 12 months 321 · prior 12 335(-4%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Exploration & Prod. Co.Jan 1993 → Jun 1993
  2. 2Kodiak Productions LtdJul 1993 → May 2000
  3. 3TXP, IncorporatedJun 2000 → Dec 2003
  4. 4Pogo Producing CompanyJan 2004 → Jan 2008
  5. 5Pogo Producing Company LLCFeb 2008 → Feb 2008
  6. 6OXY USA Inc.Mar 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
13855-99DrillPennzoil CompanyDec 12, 1977Dec 12, 1977Dec 26, 19777,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-75555————
—— O-9-10612————

Formation tops

As filed on W-2/G-1. Subsea from 2,441 ft elevation.Download CSV →

FormationMD ftSubsea
B/Cretaceous1,3251,116
WolfcampUPPER WOLFCAMP LIME4,505-2,064
B/Upper Wolfcamp Lime4,785-2,344
WolfcampLOWER WOLFCAMP LIME5,238-2,797
B/L.w.c.lm & T/Canyon5,798-3,357
StrawnSTRAWN LIME7,357-4,916

Perforations

Perforated and open-hole intervals.

FromToType
4,5724,582Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,37211475 S
5.55,5887.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 20, 1991Nov 15, 1990—
00Nov 27, 1990——
00Oct 26, 1990Sep 4, 1990—
00Jan 12, 1984Mar 21, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41330647, documented in the API reference.