WELL · 42-413-30979 · DISTRICT 7

Camar(strawn) Field Unit #WSW #1

Plugged

Schleicher County · Camar (Strawn-Oil) field  · Vertical

Camar(Strawn) Field Unit #WSW #1 (API 42-413-30979) is a plugged well in Schleicher County, plugged June 3, 1998, last operated by Woodstone Enterprises Inc..

The RRC has issued one drilling permit, issued November 20, 1980, permitted to 5,800 ft.

It was permitted by Getty Oil CO. and has since transferred to Woodstone Enterprises Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Coleman Junction, Swastika Sand, Strawn, Ellenburger.

Its lease has reported 19.6K barrels of oil and 566 mcf of gas since January 1993, last reporting in July 2026. The lease carries 44 wells, so these are lease totals, not this well alone.

Operator of record

Woodstone Enterprises Inc.

Permitted by Getty Oil Co.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Nov 6, 1998

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWoodstone Enterprises Inc.
Production reportsWoodstone Enterprises, Inc.through Sep 1996
Latest permitGetty Oil Co.Nov 20, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,800
total depth, ft
1
permits on file
Nov 20, 1980
last permit issued
Feb 10, 1981
completed
19.6K
cumulative oil, bbl
566
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 10, 1981
Shut in
—
Plugged
Jun 3, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 44 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Camar(strawn) Field Unit O-9-8616Camar (Strawn-Oil)Woodstone Enterprises, Inc.4419.6K566Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Betwell Oil & Gas CompanyJan 1993 → Nov 1995
  2. 2Woodstone Enterprises, Inc.Feb 1996 → Sep 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
99978-99DrillGetty Oil Co.Nov 20, 1980Nov 20, 1980Dec 31, 19805,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-8616————

Formation tops

As filed on W-2/G-1. Subsea from 2,432 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionBASE/COLEMAN JUNCTION1,764668
Swastika Sand2,760-328
StrawnSTRAWN SAND4,281-1,849
Ellenburger4,844-2,412
Cambrian5,630-3,198

Perforations

Perforated and open-hole intervals.

FromToType
5,6595,694Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7561214.75640 S
75,80030520 S
75,8008.75820 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 7, 1997Jul 18, 1995—
00Jan 12, 1984Aug 10, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
May 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000084013W-14 DisposalPlugged Jun 11, 19981,0001,8005,659–5,694

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41330979, documented in the API reference.