WELL · 42-413-31361 · DISTRICT 7

Robinson #1

Plugged

Schleicher County · Arlene (Harkey) field  · Vertical

Robinson #1 (API 42-413-31361) is a plugged well in Schleicher County, plugged May 5, 1989, last operated by Caraway Operating CO..

The RRC has issued 3 drilling permits between 1983 and 2008, permitted to 13,043 ft.

It was permitted by Capitol Well Servicing CO., Inc. and has since transferred to Caraway Operating CO. on the wellbore schedule.

Completion filings report 7 formation tops, including Coleman Junction, Palo Pinto, Harkey Lime, Harkey.

Its lease has reported 753 barrels of oil and 866 mcf of gas since July 2009, last reporting in March 2013.

Operator of record

Caraway Operating Co.

Permitted by Capitol Well Servicing Co., Inc.; the EWA schedule now lists a different operator.

San Angelo, TX · P-5 Y, filed Nov 4, 2025 · 143 permits on file · (325) 224-4428

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCaraway Operating Co.
Production reportsCapitol Well Servicing Co., Inc.through Mar 2013
Latest permitCapitol Well Servicing Co., Inc.Aug 13, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,043
total depth, ft
3
permits on file
Aug 13, 2008
last permit issued
Apr 19, 1955
completed
753
cumulative oil, bbl
866
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2009 THROUGH Mar 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 19, 1955
Shut in
—
Plugged
May 5, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Berkshire O-9-17098ArleneCapitol Well Servicing Co., Inc.1753866Jul 2009 – Mar 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Capitol Well Servicing Co., Inc.Jul 2009 → Dec 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
665368-99ReenterCapitol Well Servicing Co., Inc.Jun 25, 2008Aug 13, 2008May 13, 200913,043
267923-99RecompletionCaraway Operating Co.Feb 25, 1985Feb 26, 1985—4,650
220821-99DrillCaraway Operating Co.Nov 14, 1983Nov 17, 1983Jan 13, 19845,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-17098————

Formation tops

As filed on W-2/G-1. Subsea from 2,395 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction1,920475
Palo Pinto4,420-2,025
Harkey Lime4,558-2,163
Harkey4,580-2,185
Harkey Sand4,580-2,185
Camar Sand4,882-2,487
Reef5,200-2,805

Perforations

Perforated and open-hole intervals.

FromToType
4,5804,592Perforated
4,5824,590Perforated
4,8844,894Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62563111275 S
4.53,6807.875400 S
4.55,2937.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 1, 2010Nov 3, 2009Yes
00Apr 6, 2010——
00May 30, 1985May 9, 1985—
00May 29, 1985——
00Apr 4, 1984Mar 2, 1984—
00Mar 10, 1984Mar 2, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41331361, documented in the API reference.