WELL · 42-413-31930 · DISTRICT 7

Reichert #1

Plugged

Schleicher County · R. E. G. (Lime 5900) field  · Vertical

Reichert #1 (API 42-413-31930) is a plugged well in Schleicher County, plugged July 20, 2010, last operated by Oxy USA Inc..

The RRC has issued one drilling permit, issued May 11, 1995, permitted to 6,300 ft.

It was permitted by Abel Production Company and has since transferred to Oxy USA Inc. on the wellbore schedule.

Completion filings report one formation top, including Strawn.

Its lease has reported 77.3K barrels of oil and 156K mcf of gas since June 1995, last reporting in November 2010. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

OXY USA Inc.

Permitted by Abel Production Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Dec 4, 2025 · 3,316 permits on file · (713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA Inc.
Production reportsOXY USA Inc.through Nov 2008
Latest permitAbel Production CompanyMay 11, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,300
total depth, ft
1
permits on file
May 11, 1995
last permit issued
Aug 26, 2005
completed
77.3K
cumulative oil, bbl
156K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1995 THROUGH Nov 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 26, 2005
Shut in
—
Plugged
Jul 20, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Reichert O-9-13812R. E. G. (Lime 5900)OXY USA Inc.277.3K156KJun 1995 – Nov 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Abel Production CompanyJun 1995 → Jun 1997
  2. 2TXP, IncorporatedJul 1997 → Dec 2003
  3. 3Pogo Producing CompanyJan 2004 → Jan 2008
  4. 4Pogo Producing Company LLCFeb 2008 → Feb 2008
  5. 5OXY USA Inc.Mar 2008 → Oct 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
435765-99DrillAbel Production CompanyMay 11, 1995May 11, 1995May 19, 19956,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-13812————

Formation tops

As filed on W-2/G-1. Subsea from 2,413 ft elevation.Download CSV →

FormationMD ftSubsea
StrawnSTRAWN LIME5,900-3,487

Perforations

Perforated and open-hole intervals.

FromToType
2,1082,124Perforated
2,1602,220Perforated
5,9005,918Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62562512.25280 S
4.55,9917.625700 S
4.55,9917.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 5, 2006Oct 6, 2005—
00Sep 20, 1995Jul 5, 1995Yes
00Jul 19, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
178K
bbl, all reported
May 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093331W-14 DisposalPlugged Aug 30, 20103,0001,0502,108–2,220

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 20,360(-100%)

02K4K6K20092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41331930, documented in the API reference.