WELL · 42-413-32857 · DISTRICT 7

Meador-Hengst et AL #1

N

Schleicher County · Wildcat field  · Vertical

Meador-Hengst ET AL #1 (API 42-413-32857) is a well in Schleicher County operated by Shoco Production L.P., completed May 1, 2013.

The RRC has issued 2 drilling permits between 2012 and 2015, permitted to 8,000 ft.

It was permitted by Eagle Production, Inc. and has since transferred to Shoco Production L.P. on the wellbore schedule.

Completion filings report one formation top, including L. Wolfcamp.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 3.13K barrels injected in the 12 months reported through May 2023.

Operator of record

Shoco Production L.P.

Permitted by Eagle Production, Inc.; the EWA schedule now lists a different operator.

Kilgore, TX · P-5 Y, filed Jul 3, 2020 · 41 permits on file · (903) 242-8818

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShoco Production L.P.
Production reportsnone
Latest permitEagle Production, Inc.Sep 30, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
2
permits on file
Sep 30, 2015
last permit issued
May 1, 2013
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 1, 2013
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Meador-Hengst, et AL O-9-19024Cody Bell, SW. (Wolfcamp)Q Natural Resources, LLC100Sep 2013 – Jul 2026
Meador-Hengst, et AL O-9-18302WildcatShoco Production, L.P.100May 2013 – Dec 2018

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
810692-99RecompletionEagle Production, Inc.Sep 28, 2015Sep 30, 2015Sep 2, 20128,000
744362-99DrillMarquee CorporationJul 10, 2012Jul 18, 2012Sep 2, 20128,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-18302————
—— O-9-19024————

Formation tops

As filed on W-2/G-1. Subsea from 2,500 ft elevation.Download CSV →

FormationMD ftSubsea
L. Wolfcamp2,000500
L. Wolfcamp5,250-2,750

Perforations

Perforated and open-hole intervals.

FromToType
3,0263,054Perforated
3,4403,445Perforated
3,4623,472Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,21212.25650 S
4.57,7507.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 20, 2016May 12, 2016Yes
00Sep 8, 2015Mar 17, 2015—
00Feb 28, 2014Sep 16, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

3.13K
bbl, last 12 reported months
30.1K
bbl, all reported
May 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111417W-14 DisposalActive1,5001,5003,000–3,520

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 3,125 · prior 12 3,020(+3%)

010020030020222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41332857, documented in the API reference.