WELL · 42-413-32869 · DISTRICT 7

Harris -C- #9

Plugged

Schleicher County · Toe Nail (Strawn) field  · Vertical

Harris -C- #9 (API 42-413-32869) is a plugged well in Schleicher County, plugged July 29, 2014, last operated by Williams Oil Company.

The RRC has issued one drilling permit, issued March 6, 2013, permitted to 5,800 ft.

Completion filings report 3 formation tops, including Palo Pinto, Harkey Sand, Strawn.

Its lease has reported 111K barrels of oil and 214K mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Williams Oil Company

Midland, TX · P-5 Y, filed Oct 4, 2025 · 177 permits on file · (432) 967-1359

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWilliams Oil Company
Production reportsWilliams Oil Companythrough Jul 2015
Latest permitWilliams Oil CompanyMar 6, 2013
5,800
total depth, ft
1
permits on file
Mar 6, 2013
last permit issued
Aug 26, 2013
completed
111K
cumulative oil, bbl
214K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 26, 2013
Shut in
—
Plugged
Jul 29, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Harris -C- O-9-2040Toe Nail (Strawn)Williams Oil Company3111K214KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Williams Oil CompanyJun 1994 → Jan 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
752059-99DrillWilliams Oil CompanyNov 26, 2012Mar 6, 2013Aug 5, 20135,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-2040————

Formation tops

As filed on W-2/G-1. Subsea from 2,402 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto4,430-2,028
Harkey Sand4,587-2,185
StrawnSTRAWN SAND4,760-2,358
StrawnSTRAWN LIMESTONE5,145-2,743

Perforations

Perforated and open-hole intervals.

FromToType
4,7744,781Perforated
5,1635,190Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62560311335 S
5.54,4917.875105 S
5.55,1637.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 6, 2014Mar 12, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41332869, documented in the API reference.