WELL · 42-415-30232 · DISTRICT 8

Cary #6

Plugged

Scurry County · Sharon Ridge (2400) field  · Vertical

Cary #6 (API 42-415-30232) is a plugged well in Scurry County, plugged December 14, 2004, last operated by Abraxas Production Corporation.

The RRC has issued one drilling permit, issued July 13, 1977, permitted to 3,320 ft.

It was permitted by Pearson Sibert Oil CO. Of Texas and has since transferred to Abraxas Production Corporation on the wellbore schedule.

Its 2 leases have reported 32.8K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The leases carry 22 wells, so these are lease totals, not this well alone.

Operator of record

Abraxas Production Corporation

Permitted by Pearson Sibert Oil Co. of Texas; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Dec 2, 1995 · 94 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAbraxas Production Corporation
Production reportsUnitex Oil & Gas, L.L.C.through Apr 2026
Latest permitPearson Sibert Oil Co. of TexasJul 13, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,320
total depth, ft
1
permits on file
Jul 13, 1977
last permit issued
Apr 29, 1987
completed
32.8K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 29, 1987
Shut in
—
Plugged
Dec 14, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 22 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cary O-11-66987Sharon Ridge (Clear Fork)Unitex Oil & Gas, L.L.C.1132K18Apr 1993 – Jul 2026
Cary O-11-60295Sharon Ridge (2400)Abraxas Production Corporation117633Jan 1993 – Jul 1993

Oil, barrels lease total

Last 12 months 117 · prior 12 113(+4%)

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Abraxas Production CorporationJan 1993 → Jan 1996
  2. 2Abraxas Petroleum CorporationFeb 1996 → Aug 2018
  3. 3Unitex Oil & Gas, L.L.C.Sep 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
2950-99OtherPearson Sibert Oil Co. of TexasJul 13, 1977Jul 13, 1977—3,320

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-60295————
—— O-11-66987————

Perforations

Perforated and open-hole intervals.

FromToType
2,3382,536Perforated
—2,583Perforated
—2,994Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7548013300 S
72,5988.625100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 20, 1993May 6, 1987—
00May 19, 1987May 6, 1987—
00Jan 12, 1984Aug 11, 1977—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
111K
bbl, all reported
Jul 2004
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000062646H-1 InjectionPlugged Dec 31, 20044001,1002,338–2,536

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120032004

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41530232, documented in the API reference.