WELL · 42-415-32624 · DISTRICT 8

Murphy A #3

N

Scurry County · Sharon Ridge (2400) field  · Vertical

Murphy A #3 (API 42-415-32624) is a well in Scurry County operated by Murphy & Associates Inc., completed June 11, 1984.

The RRC has issued one drilling permit, issued May 22, 1984, permitted to 3,300 ft.

It was permitted by Murphy, Bill W. Operating CO,Inc and has since transferred to Murphy & Associates Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including San Andres, Clear Fork.

Its 3 leases have reported 172K barrels of oil and 98 mcf of gas since January 1993, last reporting in July 2026. The leases carry 13 wells, so these are lease totals, not this well alone.

Operator of record

Murphy & Associates Inc.

Permitted by Murphy, Bill W. Operating Co,inc; the EWA schedule now lists a different operator.

Snyder, TX · P-5 Y, filed Feb 7, 1997 · 7 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMurphy & Associates Inc.
Production reportsTrek Resources, Inc.through Apr 2026
Latest permitMurphy, Bill W. Operating Co,incMay 22, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,300
total depth, ft
1
permits on file
May 22, 1984
last permit issued
Jun 11, 1984
completed
172K
cumulative oil, bbl
98
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 11, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Murphy "A" O-11-61404Sharon Ridge (Clear Fork)Trek Resources, Inc.558.3K49Jan 1993 – Jul 2026
Murphy O-11-67063Sharon Ridge (Clear Fork)Trek Resources, Inc.4112K46Apr 1993 – Jul 2026
Murphy "A" O-11-64702Sharon Ridge (2400)Murphy & Associates, Inc.41.41K3Jan 1993 – Jul 1993

Oil, barrels lease total

Last 12 months 4,430 · prior 12 4,697(-6%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Murphy & Associates, Inc.Jan 1993 → Oct 1996
  2. 2Omni Operating Company(a)Nov 1996 → Jun 1999
  3. 3Bluestar Energy, Inc.Aug 1999 → Sep 2013
  4. 4Trek Resources, Inc.Oct 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
239707-99DrillMurphy, Bill W. Operating Co,incMay 21, 1984May 22, 1984Jun 5, 19843,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-61404————
—— O-11-64702————
—— O-11-67063————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
San Andres1,503
Clear ForkLOWER CLEAR FORK2,874

Perforations

Perforated and open-hole intervals.

FromToType
2,3262,506Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62535212.25220 sx
4.53,2197.8751,250 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 28, 1993Jul 24, 1984—
00Apr 22, 1993Jul 24, 1984—
00Aug 1, 1984Jul 24, 1984—
00Jul 31, 1984Jul 24, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41532624, documented in the API reference.