WELL · 42-415-33444 · DISTRICT 8

Shuler #5

Y

Scurry County · Tonto N. (Strawn) field · Injection  · Vertical

Shuler #5 (API 42-415-33444) is a well in Scurry County operated by Black Arrow Operating LLC, completed March 20, 1997 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued November 15, 1996, permitted to 7,500 ft.

It was permitted by Lario Oil & Gas Company and has since transferred to Black Arrow Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Strawn.

Its lease has reported 328K barrels of oil and 101K mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 13.7K barrels injected in the 12 months reported through June 2025.

Operator of record

Black Arrow Operating LLC

Permitted by Lario Oil & Gas Company; the EWA schedule now lists a different operator.

Dennis, TX · P-5 Y, filed Oct 4, 2025 · (432) 349-3846

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBlack Arrow Operating LLC
Production reportsBlack Arrow Operating, LLCthrough Apr 2026
Latest permitLario Oil & Gas CompanyNov 15, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
1
permits on file
Nov 15, 1996
last permit issued
Mar 20, 1997
completed
328K
cumulative oil, bbl
101K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 20, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shuler O-11-61487Tonto, N. (Strawn)Black Arrow Operating, LLC5328K101KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 2,526 · prior 12 2,893(-13%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lario Oil & Gas CompanyJan 1993 → Nov 2020
  2. 2Watusi Energy LLCDec 2020 → Nov 2021
  3. 3Black Arrow Operating, LLCDec 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
453270-99DrillLario Oil & Gas CompanySep 30, 1996Nov 15, 1996Feb 23, 19977,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-61487————

Formation tops

As filed on W-2/G-1. Subsea from 2,309 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn6,970-4,661

Perforations

Perforated and open-hole intervals.

FromToType
6,9786,982Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,68511995 S
5.57,0917.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 26, 2000Jun 12, 2000—
00Dec 19, 1997Apr 24, 1997Yes
00Dec 9, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

13.7K
bbl, last 12 reported months
984K
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000086966H-1 InjectionActive3002,2006,978–6,982

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 13,725 · prior 12 13,820(-1%)

05001K1.5K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41533444, documented in the API reference.