WELL · 42-415-33522 · DISTRICT 8

Taylor 46 #2

N

Scurry County · Mirage (Strawn) field  · Vertical

Taylor 46 #2 (API 42-415-33522) is a well in Scurry County operated by Cazador Operating LLC, completed May 15, 1997.

The RRC has issued one drilling permit, issued December 12, 1996, permitted to 7,900 ft.

It was permitted by Baytech, Inc. and has since transferred to Cazador Operating LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Vale, Wolfcamp, Mirage (Strawn), Strawn.

Its 2 leases have reported 51K barrels of oil and 165K mcf of gas since November 1996, last reporting in July 2026. The leases carry 19 wells, so these are lease totals, not this well alone.

Operator of record

Cazador Operating LLC

Permitted by Baytech, Inc.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Aug 4, 2025 · 2 permits on file · (214) 789-2665

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCazador Operating LLC
Production reportsManzanita Operating, LLCthrough Apr 2026
Latest permitBaytech, Inc.Dec 12, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,900
total depth, ft
1
permits on file
Dec 12, 1996
last permit issued
May 15, 1997
completed
51K
cumulative oil, bbl
165K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 15, 1997
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 19 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mirage Waterflood Unit O-11-70663Mirage (Strawn)Manzanita Operating, LLC1738.4K52KMar 2018 – Jul 2026
Taylor "46" O-11-67637Mirage (Strawn)Cazador Operating, LLC212.6K113KNov 1996 – Jul 2018

Oil, barrels lease total

Last 12 months 4,053 · prior 12 4,021(+1%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 350 · prior 12 544(-36%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Baytech, Inc.Nov 1996 → Dec 2002
  2. 2Patriot Resources, Inc.Jan 2003 → Sep 2015
  3. 3Cazador Operating, LLCMar 2018 → Dec 2018
  4. 4Manzanita Operating, LLCJan 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
456249-99DrillBaytech, Inc.Dec 12, 1996Dec 12, 1996Jan 18, 19977,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67637————
—— O-11-70663————

Formation tops

As filed on W-2/G-1. Subsea from 2,282 ft elevation.Download CSV →

FormationMD ftSubsea
Vale2,968-686
Wolfcamp4,462-2,180
WolfcampWOLFCAMP SHALE4,574-2,292
Mirage (Strawn)7,363-5,081
StrawnSTRAWN REEF7,436-5,154
Caddo7,530-5,248
MississippianMISS.7,600-5,318
Ellen.7,694-5,412

Perforations

Perforated and open-hole intervals.

FromToType
7,3637,374Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,764111,050 S
5.57,7307.8751,520 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 19, 2018Jun 16, 1997Yes
00Jul 16, 1997Jun 16, 1997Yes
00Jul 8, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41533522, documented in the API reference.