WELL · 42-415-33710 · DISTRICT 8
Mary Jane Oil Unit #1
Scurry County · Vertical
Mary Jane Oil Unit #1 (API 42-415-33710) is a plugged well in Scurry County, plugged November 5, 1999, last operated by Stewart, J. Ray.
The RRC has issued 2 drilling permits between 1999 and 2005, permitted to 5,200 ft.
Completion filings report one formation top, including Fuller.
Its 2 leases have reported 16.7K barrels of oil since November 2005, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Apr 4, 2008 · 9 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Philmarthrough Mar 2026 |
| Latest permit | Stewart, J. RayOct 5, 2005 |
- 5,200
- total depth, ft
- 2
- permits on file
- Oct 5, 2005
- last permit issued
- —
- completed
- 16.7K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 5, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Henny O-11-69248 | Tonto, NE. (Fuller) | Philmar | 3 | 16.7K | 0 | Jul 2008 – Jul 2026 |
| Mary Jane Unit O-11-68923 | Tonto, NE. (Fuller) | Philmar | 1 | 44 | 0 | Nov 2005 – Sep 2008 |
Oil, barrels lease total
Last 12 months 761 · prior 12 845(-10%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stewart, J. RaySep 2006 → Jul 2007
- 2PhilmarFeb 2010 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 607389-99 | Reenter | Stewart, J. Ray | Oct 5, 2005 | Oct 5, 2005 | Nov 22, 2005 | 5,200 |
| 488320-99 | Drill | Latimer, D. Gail Enterprises,inc | Oct 8, 1999 | Oct 8, 1999 | Oct 26, 1999 | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-68923 | — | — | — | — |
| — | — O-11-69248 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,229 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Fuller | 4,961 | -2,732 |
| Fuller | 4,970 | -2,741 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,871 | 4,990 | Perforated |
| 4,961 | 4,965 | Perforated |
| 4,976 | 4,981 | Perforated |
| 5,000 | 5,020 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,725 | 11 | 700 S |
| 4.5 | 5,070 | 7.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 12, 2012 | Nov 30, 2011 | — |
| 00 | Jul 18, 2008 | Apr 4, 2006 | — |
| 00 | Oct 6, 2006 | Apr 4, 2006 | — |
| 00 | Apr 25, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-415-33710 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-415-33710 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 145K
- bbl, all reported
- Jun 2022
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000102955 | H-1 Injection | Canceled Mar 6, 2023 | 2,000 | 2,000 | 4,861–5,127 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41533710, documented in the API reference.