WELL · 42-415-34113 · DISTRICT 8

Henderson #1

Plugged

Scurry County · Hermleigh (Strawn) field  · Horizontal

Henderson #1 (API 42-415-34113) is a plugged horizontal well in Scurry County, plugged February 10, 2022, last operated by Pilot Water Solutions Permianllc.

The RRC has issued one drilling permit, issued August 17, 2004, permitted to 7,100 ft.

It was permitted by Draco Energy, Inc. and has since transferred to Pilot Water Solutions Permianllc on the wellbore schedule.

Completion filings report 4 formation tops, including Clear Fork, Clearfor, Coleman Junction, Strawn.

Its lease has reported 1.37K barrels of oil since September 2005, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Pilot Water Solutions Permianllc

Permitted by Draco Energy, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed May 4, 2026 · 21 permits on file · (432) 699-9366

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePilot Water Solutions Permianllc
Production reportsDraco Energy, Inc.through Jun 2006
Latest permitDraco Energy, Inc.Aug 17, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,100
total depth, ft
1
permits on file
Aug 17, 2004
last permit issued
Oct 11, 2019
completed
1.37K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 11, 2019
Shut in
—
Plugged
Feb 10, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henderson O-11-69028Hermleigh (Strawn)Pilot Water Solutions Permianllc21.37K0Sep 2005 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Draco Energy, Inc.Sep 2005 → Jun 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
549369-99DrillDraco Energy, Inc.Aug 9, 2004Aug 17, 2004Sep 10, 20047,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-69028————

Formation tops

As filed on W-2/G-1. Subsea from 2,291 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK1,902389
Clearfor3,671-1,380
Clear ForkCLEARFORK3,671-1,380
Coleman Junction3,750-1,459
StrawnSTRAWN LIME6,802-4,511
StrawnSTRAWN SAND6,892-4,601
StrawnSTRAWN LIME68,002-65,711

Perforations

Perforated and open-hole intervals.

FromToType
3,6713,723Perforated
6,8138,232Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,70012.25710 S
77,0618.75550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 25, 2020Oct 18, 2019—
00Sep 17, 2018Jul 6, 2018—
00Sep 8, 2014Oct 15, 2013—
00Apr 20, 2007Aug 16, 2006Yes
00Jan 12, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
17.3M
bbl, all reported
Jun 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105814W-14 DisposalPlugged Apr 22, 202225,0001,8353,671–3,723

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 818,794(-100%)

0200K400K20212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41534113, documented in the API reference.