WELL · 42-415-34217 · DISTRICT 8

Ira /1700 Zone/ Unit #3316

Y

Scurry County · Sharon Ridge (1700) field · Shut IN  · Horizontal

Ira /1700 Zone/ Unit #3316 (API 42-415-34217) is a horizontal well in Scurry County operated by Rigged UP LLC, completed June 20, 2006 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued January 18, 2006, permitted to 1,950 ft.

It was permitted by Tandem Energy Corporation and has since transferred to Rigged UP LLC on the wellbore schedule.

Completion filings report one formation top, including San Andres.

Its lease has reported 2.2M barrels of oil and 26 mcf of gas since January 1993, last reporting in July 2026. The lease carries 472 wells, so these are lease totals, not this well alone.

Operator of record

Rigged UP LLC

Permitted by Tandem Energy Corporation; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Apr 4, 2026 · (940) 549-0131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRigged UP LLC
Production reportsRigged UP, LLCthrough Oct 2025
Latest permitTandem Energy CorporationJan 18, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,950
total depth, ft
2
permits on file
Jan 18, 2006
last permit issued
Jun 20, 2006
completed
2.2M
cumulative oil, bbl
26
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 20, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 472 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ira /1700 Zone/ Unit O-11-60411Sharon Ridge (1700)Rigged UP, LLC4722.2M26Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 202 · prior 12 1,593(-87%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Southwest Royalties, Inc.Jan 1993 → Sep 2003
  2. 2Arrowhead Operating Inc.Oct 2003 → Apr 2005
  3. 3Tandem Energy CorporationMay 2005 → Jul 2013
  4. 4M & K Operating LLCAug 2013 → Jun 2014
  5. 5Bluff Creek Operating, LLCJul 2014 → Jun 2016
  6. 6Orland Oil & Gas LLCJul 2016 → Jul 2024
  7. 7Rigged UP, LLCDec 2024 → Oct 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
612346-98DrillTandem Energy CorporationFeb 24, 2006Jan 18, 2006Feb 24, 20061,950
612346-99DrillTandem Energy CorporationJan 12, 2006Jan 18, 2006Feb 24, 20061,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-60411————

Formation tops

As filed on W-2/G-1. Subsea from 2,296 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres1,551745

Perforations

Perforated and open-hole intervals.

FromToType
1,6182,992Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62535912.25250 S
5.51,6187.875415 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 1, 2007Jan 8, 2007Yes
00Feb 23, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41534217, documented in the API reference.