WELL · 42-415-34441 · DISTRICT 8
Big Creek #1H
Scurry County · Earnest (6500 Sand) field · Horizontal
Big Creek #1H (API 42-415-34441) is a plugged horizontal well in Scurry County, plugged October 11, 2021, last operated by Sojourner Drilling Corporation.
The RRC has issued one drilling permit, issued July 15, 2008, permitted to 9,000 ft.
It was permitted by Round Rock Resources, Inc. and has since transferred to Sojourner Drilling Corporation on the wellbore schedule.
Completion filings report 2 formation tops, including Strawn, Ellenburger.
Its lease has reported 58.3K barrels of oil and 134K mcf of gas since December 2008, last reporting in May 2022.
Operator of record
Sojourner Drilling Corporation
Permitted by Round Rock Resources, Inc.; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sojourner Drilling Corporation |
| Production reports | Sojourner Drilling Corporationthrough Jul 2020 |
| Latest permit | Round Rock Resources, Inc.Jul 15, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- Jul 15, 2008
- last permit issued
- Dec 8, 2008
- completed
- 58.3K
- cumulative oil, bbl
- 134K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2008 THROUGH May 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 8, 2008
- Shut in
- —
- Plugged
- Oct 11, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Big Creek O-11-69441 | Earnest (6500 Sand) | Sojourner Drilling Corporation | 1 | 58.3K | 134K | Dec 2008 – May 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Round Rock Resources, Inc.Aug 2009 → Nov 2011
- 2Brahman Operating, L.L.C.Jan 2012 → Sep 2012
- 3Sojourner Drilling CorporationOct 2012 → Jul 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 665561-99 | Drill | Round Rock Resources, Inc. | Jun 27, 2008 | Jul 15, 2008 | Jul 20, 2008 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-69441 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,306 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 6,910 | -4,604 |
| Ellenburger | 7,400 | -5,094 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,100 | 9,251 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,572 | 17.5 | 385 S |
| 7.625 | 7,025 | 9.875 | 280 S |
| 5.5 | 9,348 | 6.75 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 7, 2010 | Sep 14, 2009 | Yes |
| 00 | Nov 16, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-415-34441 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-415-34441 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.