WELL · 42-415-34517 · DISTRICT 8
Nachlinger #1H
Scurry County · Hermleigh (Strawn) field · NO Production · Horizontal
Nachlinger #1H (API 42-415-34517) is a horizontal well in Scurry County operated by North Fork Operating LP, completed August 28, 2009 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued February 25, 2009, permitted to 6,950 ft.
It was permitted by P. L. O. and has since transferred to North Fork Operating LP on the wellbore schedule.
Completion filings report 3 formation tops, including Coleman Junction, Wolfcamp, Strawn.
Its lease has reported 37.3K barrels of oil and 86.6K mcf of gas since August 2009, last reporting in July 2026.
Operator of record
Permitted by P. L. O.; the EWA schedule now lists a different operator.
Mustang, OK · P-5 Y, filed Feb 4, 2026 · 1 permits on file · (432) 242-7381
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | North Fork Operating LP |
| Production reports | North Fork Operating LPthrough Apr 2026 |
| Latest permit | P. L. O.Feb 25, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,950
- total depth, ft
- 1
- permits on file
- Feb 25, 2009
- last permit issued
- Aug 28, 2009
- completed
- 37.3K
- cumulative oil, bbl
- 86.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 28, 2009
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nachlinger O-11-69471 | Hermleigh (Strawn) | North Fork Operating LP | 1 | 37.3K | 86.6K | Aug 2009 – Jul 2026 |
Oil, barrels lease total
Last 12 months 157 · prior 12 74(+112%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1P. L. O.Sep 2009 → Apr 2016
- 2King Operating CorporationAug 2016 → Dec 2019
- 3Strawn Petroleum Operating, LLCJan 2020 → Mar 2024
- 4North Fork Operating LPMay 2024 → Apr 2026
Permits
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-69471 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,417 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 3,920 | -1,503 |
| Wolfcamp | 5,000 | -2,583 |
| StrawnSTRAWN SAND | 6,890 | -4,473 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,450 | 9,255 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,620 | 12.25 | 1,150 S |
| 7 | 7,063 | 8.75 | 855 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 23, 2010 | Oct 15, 2009 | Yes |
| 00 | Feb 4, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-415-34517 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-415-34517 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41534517, documented in the API reference.