WELL · 42-415-34696 · DISTRICT 8

Teas Paul #2R

Y

Scurry County · Sharon Ridge (1700) field · Producing  · Vertical

Teas Paul #2R (API 42-415-34696) is a well in Scurry County operated by Griffin Energy Holdings LLC, completed July 10, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 13, 2011, permitted to 1,850 ft.

It was permitted by Neff, Mickey Oil Company Inc. and has since transferred to Griffin Energy Holdings LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Red Rock, Anhy & Red Rock, Yates, Lime.

Its lease has reported 20.3K barrels of oil and 36 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Griffin Energy Holdings LLC

Permitted by Neff, Mickey Oil Company Inc.; the EWA schedule now lists a different operator.

Plano, TX · P-5 Y, filed Oct 4, 2025 · (325) 207-1334

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGriffin Energy Holdings LLC
Production reportsGriffin Energy Holdings, LLCthrough Apr 2026
Latest permitNeff, Mickey Oil Company Inc.Apr 13, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,850
total depth, ft
1
permits on file
Apr 13, 2011
last permit issued
Jul 10, 2011
completed
20.3K
cumulative oil, bbl
36
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 10, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Teas, Paul O-11-5758Sharon Ridge (1700)Griffin Energy Holdings, LLC320.3K36Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 698 · prior 12 711(-2%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Murphy & Associates, Inc.Jan 1993 → Oct 1996
  2. 2Omni Operating Company(a)Nov 1996 → Jun 1998
  3. 3Bluestar Energy, Inc.Jul 2001 → Jul 2001
  4. 4Neff, Mickey Oil Company Inc.Aug 2003 → Dec 2015
  5. 5Griffin Energy Holdings, LLCJan 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
713253-99DrillNeff, Mickey Oil Company Inc.Mar 30, 2011Apr 13, 2011May 11, 20111,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-5758————

Formation tops

As filed on W-2/G-1. Subsea from 2,213 ft elevation.Download CSV →

FormationMD ftSubsea
Red Rock1602,053
Anhy & Red Rock7301,483
Yates1,1501,063
Lime1,1601,053
Lime & Shale1,645568
San Andres1,700513
Sandstone/Blue Shale——

Perforations

Perforated and open-hole intervals.

FromToType
1,6481,736Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62545612.25300 S
5.51,8387.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 18, 2011Aug 8, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41534696, documented in the API reference.