WELL · 42-415-34933 · DISTRICT 8
Fuller #5431V
Scurry County · Corazon (San Andres) field · Shut IN · Vertical
Fuller #5431V (API 42-415-34933) is a well in Scurry County operated by D & D Well Service L.L.C., completed September 22, 2013 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued September 17, 2013, permitted to 6,000 ft.
It was permitted by Hadaway Consult And Engineer,LLC and has since transferred to D & D Well Service L.L.C. on the wellbore schedule.
Completion filings report 2 formation tops, including Yates, San Andres.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit.
Operator of record
Permitted by Hadaway Consult and Engineer,llc; the EWA schedule now lists a different operator.
Post, TX · P-5 Y, filed Oct 4, 2025 · (806) 549-1619
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | D & D Well Service L.L.C. |
| Production reports | none |
| Latest permit | Hadaway Consult and Engineer,llcSep 17, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- Sep 17, 2013
- last permit issued
- Sep 22, 2013
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 22, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Fuller O-11-70203 | Corazon (San Andres) | D & D Well Service, L.L.C. | 1 | 0 | 0 | Nov 2013 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 769792-99 | Drill | Hadaway Consult and Engineer,llc | Sep 10, 2013 | Sep 17, 2013 | Sep 16, 2013 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-70203 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,463 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 1,216 | 1,247 |
| San Andres | 1,810 | 653 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,170 | 2,200 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 555 | 17.5 | 800 S |
| 9.625 | 2,300 | 12.25 | 1,250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 24, 2014 | Oct 8, 2014 | — |
| 00 | Sep 24, 2014 | Jan 16, 2014 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-415-34933 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-415-34933 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.49M
- bbl, all reported
- Jun 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000109511 | H-1 Injection | Active | 3,000 | 1,085 | 2,170–2,650 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41534933, documented in the API reference.