WELL · 42-417-00517 · DISTRICT 7

Grant Opal #1C

Plugged

Shackelford County · Gillian (Caddo) field  · Vertical

Grant Opal #1C (API 42-417-00517) is a plugged well in Shackelford County, plugged March 27, 2019, last operated by Van Operating Ltd..

The RRC has issued 2 drilling permits between 2000 and 2002, permitted to 4,280 ft.

Completion filings report 4 formation tops, including T/Palo Pinto, T/Palo Pinto O, B/Palo Pinto, T/Strawn Lime.

Its 5 leases have reported 6.54K barrels of oil and 339K mcf of gas since January 1993, last reporting in March 2019. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Van Operating Ltd.

Albany, TX · P-5 Inactive, filed Jan 28, 2021 · 96 permits on file · (325) 762-3353

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVan Operating Ltd.
Production reportsVan Operating, Ltd.through May 2015
Latest permitVan Operating, Ltd.Sep 24, 2002
4,280
total depth, ft
2
permits on file
Sep 24, 2002
last permit issued
Feb 25, 2001
completed
6.54K
cumulative oil, bbl
339K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 25, 2001
Shut in
—
Plugged
Mar 27, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Grant, Opal G-8-44502Frank Doss (Duffer)Van Operating, Ltd.10180KJan 1993 – Mar 2019
Grant, Opal G-8-59926Frank Doss (Miss)Van Operating, Ltd.100Jan 1993 – Mar 2019
Grant, Opal G-8-192161Frank Doss (Duffer)Van Operating, Ltd.10106KMay 2002 – Mar 2019
Grant, Opal O-8-28925Gillian (Caddo)Van Operating, Ltd.16.54K37.5KFeb 2001 – Feb 2003
Grant, Opal G-8-180824Gillian (Caddo)Van Operating, Ltd.1015.3KDec 2000 – Jan 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Jan 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → May 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
523884-99RecompletionVan Operating, Ltd.Sep 20, 2002Sep 24, 2002May 13, 20024,280
502883-99RecompletionVan Operating, Ltd.Dec 11, 2000Dec 14, 2000Nov 27, 20004,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-44502————
—— G-8-59926————
—— G-8-180824————
—— G-8-192161————
—— O-8-28925————

Formation tops

As filed on W-2/G-1. Subsea from 1,216 ft elevation.Download CSV →

FormationMD ftSubsea
T/Palo Pinto1,756-540
T/Palo Pinto O1,756-540
B/Palo Pinto1,862-646
T/Strawn Lime2,458-1,242

Perforations

Perforated and open-hole intervals.

FromToType
3,4753,475Perforated
3,4753,484Perforated
3,4883,490Perforated
3,4933,499Perforated
3,5123,515Perforated
3,9954,002Perforated
—4,330Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.5447.875250 S
10.759513.375—
10.759513.75—
4.54,3664.09250 S
4.54,3667.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 20, 2003Sep 9, 2002—
00Jan 10, 2003——
00Jan 24, 2002Feb 14, 2001—
00Apr 19, 2001Dec 11, 2000Yes
00Feb 26, 2001——
00Feb 23, 2001——
00Jan 12, 1984Aug 12, 1968—
00Jan 12, 1984Aug 6, 1968—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41700517, documented in the API reference.