WELL · 42-417-04518 · DISTRICT 7
Midkiff #2
Shackelford County · Vertical
Midkiff #2 (API 42-417-04518) is a former disposal or injection well in Shackelford County, last operated by Mna Enterprises Ltd. CO.; its UIC permit is no longer active.
The RRC has issued one drilling permit, issued February 28, 2012, permitted to 2,064 ft.
Its lease has reported 78.6K barrels of oil and 5.52K mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.
Operator of record
Hobbs, NM · P-5 Y, filed Jan 13, 2025 · 5 permits on file · (575) 390-3300
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hooper Oil & Gas, LLCthrough Dec 2013 |
| Latest permit | Mna Enterprises Ltd. Co.Feb 28, 2012 |
- 2,064
- total depth, ft
- 1
- permits on file
- Feb 28, 2012
- last permit issued
- —
- completed
- 78.6K
- cumulative oil, bbl
- 5.52K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Midkiff O-8-5504 | Moran (Strawn 2100) | Texowa, LLC | 8 | 78.6K | 5.52K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1North Central Casing Pullers,incJan 1993 → Apr 1996
- 2G E Operating, Inc.May 1996 → Jan 2003
- 3Mesquite Land & Minerals Co.May 2003 → Jun 2003
- 4Frontier Operating CorporationSep 2005 → Oct 2010
- 5Mna Enterprises Ltd. Co.Jun 2011 → Feb 2013
- 6Hooper Oil & Gas, LLCMar 2013 → Dec 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 733981-99 | Reclass | Mna Enterprises Ltd. Co. | Feb 15, 2012 | Feb 28, 2012 | — | 2,064 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-5504 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,048 | 2,052 | Perforated |
| 2,048 | 2,064 | Perforated |
| — | 2,047 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 62 | — | — |
| 7 | 2,047 | — | — |
| 7 | 2,048 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 25, 2005 | Jul 22, 2004 | — |
| 00 | Sep 24, 2002 | Jul 22, 2002 | — |
| 00 | May 17, 1994 | Mar 9, 1994 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-04518 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-04518 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 3.6K
- bbl, last 12 reported months
- 1.36M
- bbl, all reported
- Jun 2005
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000078767 | H-1 Injection | Plugged Aug 28, 2019 | 1,000 | 1,000 | 2,048–2,064 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 3,600 · prior 12 350(+929%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41704518, documented in the API reference.