WELL · 42-417-31779 · DISTRICT 7

South Green 71 #2

N

Shackelford County · Pannel S. (Miss) field  · Vertical

South Green 71 #2 (API 42-417-31779) is a well in Shackelford County operated by Van Operating Ltd., completed January 21, 1992.

The RRC has issued 3 drilling permits between 1992 and 2004, permitted to 4,540 ft.

Completion filings report 6 formation tops, including Strawn, T/Strawn, Caddo, T/Caddo.

Its 4 leases have reported 82.2K barrels of oil and 100K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Van Operating Ltd.

Albany, TX · P-5 Inactive, filed Jan 28, 2021 · 96 permits on file · (325) 762-3353

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVan Operating Ltd.
Production reportsBasin Operating Inc.through Apr 2026
Latest permitVan Operating, Ltd.Dec 20, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,540
total depth, ft
3
permits on file
Dec 20, 2004
last permit issued
Jan 21, 1992
completed
82.2K
cumulative oil, bbl
100K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 21, 1992
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
South Green "71" O-8-29486Ben's (Gardner)Basin Operating Inc.128.5K25.9KDec 2004 – Jul 2026
South Green "71" O-8-26456Pannel, S. (Miss)Van Operating, Ltd.100Jan 1993 – Mar 2008
South Green "71" O-8-26849Gem (Caddo)Van Operating, Ltd.153.7K74.2KMar 1993 – May 2005
— O-8-13138——000—

Oil, barrels lease total

Last 12 months 7 · prior 12 6(+17%)

01202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Mar 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → Mar 2021
  3. 3Basin Operating Inc.Apr 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
555052-99RecompletionVan Operating, Ltd.Dec 17, 2004Dec 20, 2004—3,910
410285-99RecompletionJones Company, Ltd.Mar 29, 1993Mar 31, 1993Mar 17, 19934,540
396483-99RecompletionJones Company, Ltd.Feb 6, 1992Feb 13, 1992Jan 13, 19924,540

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-13138————
—— O-8-26456————
—— O-8-26849————
—— O-8-29486————

Formation tops

As filed on W-2/G-1. Subsea from 1,614 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn3,142-1,528
T/Strawn3,142-1,528
Caddo3,930-2,316
T/Caddo3,930-2,316
MississippianMISS4,382-2,768
T/Miss4,382-2,768

Perforations

Perforated and open-hole intervals.

FromToType
3,2823,289Perforated
3,9433,954Perforated
3,9593,963Perforated
4,3864,492Perforated
4,4044,419Perforated
4,5234,530Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516312.25110 S
8.62516312.5110 S
4.54,5377.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 2, 2005Dec 17, 2004Yes
00Mar 23, 2005——
00Jun 16, 1993Mar 25, 1993Yes
00Apr 14, 1993Feb 4, 1992Yes
00Apr 13, 1992Feb 4, 1992Yes
00Mar 6, 1992Jun 14, 1976—
00Jan 12, 1984Jun 14, 1976—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41731779, documented in the API reference.