WELL · 42-417-32059 · DISTRICT 7

South Green 69 #1

Plugged

Shackelford County · V. G. East (Ellen) field  · Vertical

South Green 69 #1 (API 42-417-32059) is a plugged well in Shackelford County, plugged May 10, 2019, last operated by Jones CO..

The RRC has issued 3 drilling permits between 1977 and 1994, permitted to 4,900 ft.

It was permitted by Jones Company, Ltd. and has since transferred to Jones CO. on the wellbore schedule.

Completion filings report 5 formation tops, including T/Harry Key, T/Strawn, T/Caddo, B/Caddo.

Its 3 leases have reported 16.9K barrels of oil and 1.33K mcf of gas since January 1993, last reporting in May 2022. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Jones Co.

Permitted by Jones Company, Ltd.; the EWA schedule now lists a different operator.

Albany, TX · P-5 Y, filed Apr 15, 1991 · 779 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJones Co.
Production reportsVan Operating, Ltd.through Dec 2016
Latest permitJones Company, Ltd.Aug 3, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
3
permits on file
Aug 3, 1994
last permit issued
—
completed
16.9K
cumulative oil, bbl
1.33K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 10, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
South Green "69" O-8-14634LE Ann (3250)Van Operating, Ltd.216.8K3Jan 1993 – May 2022
South Green "69" O-8-27033Donna (Caddo)Jones Company, Ltd.1714Oct 1993 – Sep 1994
South Green "69" G-8-79127Donna (Caddo)Jones Company, Ltd.101.33KJan 1993 – Oct 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Jan 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → Dec 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
426476-99RecompletionJones Company, Ltd.Aug 1, 1994Aug 3, 1994Jun 29, 19944,795
34666-99RecompletionJones Company, Ltd.Oct 16, 1978Oct 16, 1978—4,795
3843-99DrillJones Company, Ltd.Jul 25, 1977Jul 25, 1977Jul 25, 19774,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-79127————
—— O-8-14634————
—— O-8-27033————

Formation tops

As filed on W-2/G-1. Subsea from 1,890 ft elevation.Download CSV →

FormationMD ftSubsea
T/Harry Key3,328-1,438
T/Strawn3,509-1,619
T/Strawn3,518-1,628
T/Caddo4,259-2,369
B/Caddo4,534-2,644
T/Miss4,674-2,784

Perforations

Perforated and open-hole intervals.

FromToType
3,3343,340Perforated
4,2904,298Perforated
4,797—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516112.25110 S
2.3754,307——
4.54,7977.875115 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 4, 1994Jul 29, 1994Yes
00Aug 16, 1994Nov 8, 1993—
00Jan 28, 1994Nov 8, 1993—
00Dec 2, 1993——
00Jan 12, 1984Oct 6, 1978—
00Jan 12, 1984Jul 5, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41732059, documented in the API reference.