WELL · 42-417-32425 · DISTRICT 7
Nail -B- 19-20 #5
Shackelford County · Nancy N. (Cook) field · Vertical
Nail -B- 19-20 #5 (API 42-417-32425) is a plugged well in Shackelford County, plugged October 28, 2013, last operated by T-N-T Engineering Inc..
The RRC has issued one drilling permit, issued January 10, 1978, permitted to 1,324 ft.
It was permitted by Musselman Petroleum & Land CO. and has since transferred to T-N-T Engineering Inc. on the wellbore schedule.
Completion filings report one formation top, including Cook.
Operator of record
Permitted by Musselman Petroleum & Land Co.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Delinquent, filed Jul 18, 2018 · 185 permits on file · (817) 921-1889
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | T-N-T Engineering Inc. |
| Production reports | none |
| Latest permit | Musselman Petroleum & Land Co.Jan 10, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,324
- total depth, ft
- 1
- permits on file
- Jan 10, 1978
- last permit issued
- Jul 28, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 28, 1986
- Shut in
- —
- Plugged
- Oct 28, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail -B- 19-20 G-8-74999 | Nancy N. (Cook) | T-N-T Engineering, Inc. | 1 | 0 | 0 | Jan 1993 – Oct 2013 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 11778-99 | Drill | Musselman Petroleum & Land Co. | Jan 10, 1978 | Jan 10, 1978 | Nov 16, 1977 | 1,324 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-74999 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,454 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cook | 1,036 | 418 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,034 | 1,038 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 107 | 8.75 | 60 S |
| 4.5 | 1,300 | 6.25 | 70 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 3, 1988 | Oct 24, 1988 | — |
| 00 | Jan 12, 1984 | Jan 9, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-32425 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-32425 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.99M
- bbl, all reported
- Nov 2014
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000049503 | W-14 Disposal | Plugged Nov 5, 2013 | 100 | 100 | 1,036–1,040 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41732425, documented in the API reference.