WELL · 42-417-32517 · DISTRICT 7

Hendrick 75D #4

Plugged

Shackelford County · C.E.J. (Strawn) field  · Vertical

Hendrick 75d #4 (API 42-417-32517) is a plugged well in Shackelford County, plugged October 13, 2022, last operated by Petex.

The RRC has issued one drilling permit, issued January 27, 1978, permitted to 5,300 ft.

It was permitted by Jacobs, C. E., CO. and has since transferred to Petex on the wellbore schedule.

Completion filings report 6 formation tops, including T/Saddle Creek 1s, T/Breckenridge 1s, T/Canyon 1s, T/Strawnss.

Its lease has reported 50 barrels of oil and 21 mcf of gas since January 1993, last reporting in November 2022. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Petex

Permitted by Jacobs, C. E., Co.; the EWA schedule now lists a different operator.

Breckenridge, TX · P-5 Y, filed May 4, 2026 · 124 permits on file · (254) 559-5453

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetex
Production reportsJacobs, C. E., Co.through Oct 1994
Latest permitJacobs, C. E., Co.Jan 27, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,300
total depth, ft
1
permits on file
Jan 27, 1978
last permit issued
Sep 10, 1987
completed
50
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 10, 1987
Shut in
—
Plugged
Oct 13, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hendrick 75D O-8-19114C.E.J. (Strawn)Petex45021Jan 1993 – Nov 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jacobs, C. E., Co.Jan 1993 → Oct 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
17249-99DrillJacobs, C. E., Co.Jan 27, 1978Jan 27, 1978Jan 30, 19785,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-19114————

Formation tops

As filed on W-2/G-1. Subsea from 1,705 ft elevation.Download CSV →

FormationMD ftSubsea
T/Saddle Creek 1S1,505200
T/Breckenridge 1S1,791-86
T/Canyon 1S2,630-925
T/Strawnss4,140-2,435
T/Caddo 1S4,769-3,064
T/Mississippian 1S5,148-3,443

Perforations

Perforated and open-hole intervals.

FromToType
4,1404,150Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512512125 S
4.55,1497.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 14, 1989Sep 18, 1987—
00Apr 7, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

24K
bbl, last 12 reported months
1.23M
bbl, all reported
Jun 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000065552H-1 InjectionPlugged Nov 3, 20229001,8004,140–4,150

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 23,968 · prior 12 36,686(-35%)

02K4K20212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41732517, documented in the API reference.