WELL · 42-417-32531 · DISTRICT 7

A.L. Black #3

Plugged

Shackelford County · J. T. Ranch (Duffer) field  · Vertical

A.L. Black #3 (API 42-417-32531) is a plugged well in Shackelford County, plugged July 16, 2021, last operated by Anderson Production.

The RRC has issued 3 drilling permits between 1978 and 2012, permitted to 5,000 ft.

Completion filings report 12 formation tops, including Caddo, Lake, Ellenburger, Cisco.

Its 3 leases have reported 2.39K barrels of oil and 36.1K mcf of gas since January 1993, last reporting in September 2021. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Anderson Production

Cisco, TX · P-5 Y, filed Aug 4, 2025 · 3 permits on file · (817) 994-6774

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnderson Production
Production reportsAnderson Productionthrough Mar 2021
Latest permitAnderson ProductionMay 18, 2012
5,000
total depth, ft
3
permits on file
May 18, 2012
last permit issued
Mar 25, 2009
completed
2.39K
cumulative oil, bbl
36.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 25, 2009
Shut in
—
Plugged
Jul 16, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
A.L. Black O-8-30308J. T. Ranch (Duffer)Anderson Production12.39K785Mar 2009 – Sep 2021
Black, A.L. G-8-78754Chastain (Lake)Anderson Production1028.7KJan 1993 – Jul 2021
Black, A.L. G-8-279232Chastain (Lake)Anderson Production106.6KSep 2015 – Jul 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anderson, E. D.Jan 1993 → Nov 2009
  2. 2Anderson ProductionDec 2009 → Mar 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
740322-99RecompletionAnderson ProductionMay 9, 2012May 18, 2012Jan 13, 20145,000
678653-99RecompletionAnderson, E. D.Feb 17, 2009Feb 20, 2009Mar 10, 20094,110
19458-99DrillEnserch Exploration, IncMar 6, 1978Mar 6, 1978Mar 14, 19784,150

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-78754————
—— G-8-279232————
—— O-8-30308————

Formation tops

As filed on W-2/G-1. Subsea from 1,457 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,440-1,983
Lake3,724-2,267
Lake3,726-2,269
EllenburgerELLENBERGER4,090-2,633
CiscoCISCO SAND - DISPOSAL——
Cook Sand - Disposal——
Frye - Disposal——
Hope Sand - Disposal——
King Sand - Disposal——
Saddle CreekSADDLE CREEK - DISPOSAL——
Shallow Sandstones - Overpressur——
Unidentified-County Regular - DI——
WolfcampWOLFCAMP - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
3,7263,734Perforated
3,7263,750Perforated
3,7403,750Perforated
3,9253,955Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62518412.25140 S
8.62518512.25140 S
4.54,1047.875156 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 26, 2016Feb 5, 2016—
00Jun 11, 2009Apr 17, 2009Yes
00May 5, 2009——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41732531, documented in the API reference.