WELL · 42-417-32638 · DISTRICT 7

Hooker A #1

Plugged

Shackelford County · Shackelford County Regular field  · Vertical

Hooker A #1 (API 42-417-32638) is a plugged well in Shackelford County, plugged July 21, 2009, last operated by Herencia Operating LLC.

The RRC has issued one drilling permit, issued June 27, 1978, permitted to 1,200 ft.

It was permitted by Kadane Oil Company and has since transferred to Herencia Operating LLC on the wellbore schedule.

Its lease has reported 2.16K barrels of oil and 9 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Herencia Operating LLC

Permitted by Kadane Oil Company; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Mar 6, 2015 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHerencia Operating LLC
Production reportsHerencia Operating LLCthrough Mar 1999
Latest permitKadane Oil CompanyJun 27, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,200
total depth, ft
1
permits on file
Jun 27, 1978
last permit issued
Oct 2, 1978
completed
2.16K
cumulative oil, bbl
9
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 2, 1978
Shut in
—
Plugged
Jul 21, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hooker A O-8-14648Shackelford County RegularHerencia Operating LLC12.16K9Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lsa OperatingApr 1993 → Jun 1993
  2. 2Alco Oil & Gas Co.Sep 1994 → Jun 1995
  3. 3Alco Oil & Gas Co. LLCJul 1995 → Feb 1997
  4. 4Herencia Operating LLCMar 1999 → Mar 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
27485-99DrillKadane Oil CompanyJun 27, 1978Jun 27, 1978—1,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-14648————

Perforations

Perforated and open-hole intervals.

FromToType
9881,098Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,089——
4.51,1936.75250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Oct 30, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41732638, documented in the API reference.