WELL · 42-417-32861 · DISTRICT 7

Bernstein #4

Plugged

Shackelford County  · Vertical

Bernstein #4 (API 42-417-32861) is a plugged well in Shackelford County, plugged July 11, 1979, last operated by Raw Energy Corporation.

The RRC has issued 2 drilling permits between 1979 and 1983, permitted to 4,700 ft.

Completion filings report 3 formation tops, including Caddo, Mississippian, Ellen.

Operator of record

Raw Energy Corporation

Weatherford, TX · P-5 Y, filed Jun 3, 1992 · 276 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitRaw Energy CorporationMar 28, 1983
4,700
total depth, ft
2
permits on file
Mar 28, 1983
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 11, 1979

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
189794-99OtherRaw Energy CorporationMar 28, 1983Mar 28, 1983—4,700
44911-99DrillHam & Ham Operating Co.Mar 23, 1979Mar 23, 1979Jun 27, 19794,648

Formation tops

As filed on W-2/G-1. Subsea from 1,342 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,940-2,598
MississippianMISS.4,528-3,186
Ellen4,650-3,308

Perforations

Perforated and open-hole intervals.

FromToType
4,1954,198Perforated
4,5034,510Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510212.25—
2.3754,277——
4.54,5057.875160 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 19, 1984Dec 19, 1983—
00Jan 12, 1984Dec 19, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
27.8K
bbl, all reported
Apr 1988
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000050412W-14 DisposalPlugged May 27, 19884002,0504,195–4,198

MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS

Last 12 months 0

01

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41732861, documented in the API reference.